My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0524_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0524_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 12:11:58 PM
Creation date
12/14/2009 1:41:26 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCLUSIONS <br />1. The project must be reviewed and approved by the Minnesota Department of <br />Transportation by September 30,2004. <br />2. The City must meet the standards laid out in the "Minnesota Bicycle Transportation <br />Planning and Design Guidelines" manual in order to talce advantage of Federal Funding. <br />3. Only construction costs are eligible for funding through Federal Surface Transportation <br />Program Pathway funds. The total federal funding available is $2,250,000 (80%) with a <br />minimum City matching obligation of $450,000 (20%) plus engineering and right- of- <br />way costs. <br />4. Project Alternatives: <br />Alternate 1: Bituminous Trail Proposal <br />Segment 1- Residential District; Rice Street to Lexington Avenue $570,000 <br />8 foot bituminous athwa on north side of the road <br />Segment 2- Transition District; Lexington Avenue to Snelling Avenue $160,000 <br />8 foot bituminous athwa on south side of the road <br />Segment 3- Commercial District; Snelling Avenue to Cleveland Avenue $355,000 <br />Snelling to Fairview- 6 foot concrete on both sides <br />Faiarview to Cleveland- 8 foot bituminous pathway south side of <br />road <br />Segment 4- Terminal Road, Cleveland Avenue to Walnut Street $120,000 <br />10 foot bituminous attached athwa north side of road <br />Segment 5- Walnut Street, Terminal Road to BNSF Railroad $100,000 <br />10 foot bituminous attached athwa west side of road <br />Construct wall under Snellin brid e $80,000 <br />Street li ht re lacement cost $350,000 <br />Landsca in $500,000 <br />Pro�ect Construction Cost $2,235,000 <br />County Road B-2 Trail <br />FeasibilityReport <br />May 24,2004 <br />�,.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.