Options Presented at the May 13 Meeting <br />Using the information collected, City Staff developed four options to present to property owners at <br />the second public information meeting on May 13th. In light of the anticipated attendance we <br />focused on the easterly residential district. All of the options meet the design standards required to <br />use the Federal funds. Many of the property owners in attendancewere not supportive of a project <br />that met Federal Design guidelines. As shown on the attached feedback summary a majority of the <br />owners prefer a"�ti u Build" alternative. A short description of the options: <br />Option 1: Pathway on one side of the street <br />■ 8 foot wide bituminous (or concrete) pathway <br />■ On north side of the street between Lexington and Rice Street. <br />■ 5 foot grass strip between street and pathway <br />■ Storm sewer construction on a majority of the corridor. <br />Option 2: Sidewall{ on both sides of the street <br />■ 5-6 foot concrete sidewalk on both sides of the street. <br />■ 5 foot grass strip between road and sidewalk. <br />■ Each facility would be one way. <br />' Complete storm sewer construction on both sides of the road. <br />■ On street parl�ing would not be impacted. <br />Option 3: Sidewall{ with bike lanes <br />■ 5-6 foot concrete sidewalk on north side of the street. <br />■ 5 foot grass strip between street and sidewalk <br />■ Stripe shoulders as one way bike lanes. <br />■ Widen existing shoulders by one foot. <br />■ Storm sewer construction on a majority of the corridor. <br />■ No parking allowed on either side of the road. <br />■ Construct parking lane near Dale Street for Concordia School. <br />Option 4: Reconstruct Road and build Attached Pathway <br />■ Reconstruct County Road B-2 <br />■ 32 feet wide with curb and gutter <br />■ Lower the street in some areas <br />� Complete storm sewer improvements <br />■ Assess for a portion of the street reconstruction costs <br />■ 8 foot pathway on north side of street <br />■ 2 foot paved strip between curb and pathway <br />■ No parking on one side of the street <br />■ Street grades must be a minimum of 0.5% for curb drainage. <br />■ Street reconstruction cost between Lexington and Rice Street =$2,000,000 (+ <br />engineering) <br />County Road B-2 Trail <br />Feasibility Report <br />May 24,2004 <br />� �, <br />