My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0524_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0524_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 12:11:58 PM
Creation date
12/14/2009 1:41:26 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Segment 5— Walnut St�eet, Te�ninal Road to Railroad (0.5 miles) <br />At the Walnut Street intersection the Pathway will cross to the west side and continue north to <br />the Abandoned BNSF Railroad right- of- way. The properties along Walnut Street are primarily <br />manufacturing in nature. These include Highcrest Center, Triangle Warehouse, Gage Marketing, <br />and Horton, Inc. The street is 44 feet wide, two lanes in each direction, with curb and gutter. <br />There is an abandoned railroad crossing just north of Rose Place where the pathway will meet up <br />with the proposed Northeast Diagonal Trail out of Hennepin County. The traffic count for this <br />segment is 3800 ADT. <br />Proposed Construction <br />Construct an 8 foot wide bituminous (or concrete) attached pathway on the west side of <br />Walnut Street, between Terminal Road and Abandoned Trail right- of way <br />■ Estimated Pathway Construction Cost = $100,000 ($180,000) <br />County Road B-2 Trail <br />Feasibility Report <br />May 24,2004 <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.