My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0524_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0524_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 12:11:58 PM
Creation date
12/14/2009 1:41:26 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snelling and Fairview. <br />o Estimated Pathway Construction Cost =$275,000 <br />■ Between �airview and Cleveland, construct an 8 foot wide bituminous (or concrete) <br />pathway on the south side of County Road B-2 <br />o Replace existing street lights with pedestrian level ornamental lighting between <br />Fairview and Cleveland. <br />o Estimated Pathway Construction Cost =$80,000 ($180,000) <br />Plant street trees and introduce decorative elements into the crosswallcs and medians. <br />Segment 4— Terminal Road, Cleveland Avenue to Walnut Street (0. 75 miles) <br />County Road B-2 becomes Terminal Road at the bridge over 35W. The properties along <br />Terminal Road are mainly industrial & Business Parlc in nature. These include Praxair, <br />Primesource, India Handicrafts, Artistic Finishes, American Freightways, and Old Dutch. <br />The street is between 42 and 50 feet wide, two lanes in each direction, curb and gutter. There are <br />two 4 way stop controlled intersections at Long Lalce Road and at Walnut Street. There is a <br />Railroad crossing just west of St. Croix Street. The traffic counts for this segment are <br />considerably less at 7400 and 2200 ADT. <br />There is concrete sidewallc along the north side of the street that terminates just west of the Long <br />Lalce Road intersection. The existing sidewallc does not meet the width standards required for a <br />multi-use facility. The condition rating is 95 and is considered acceptable. The City owns 14 <br />streetlights on this segment that have been in place for about 20 years and require some <br />maintenancelreplacement. There is no on street parlcing in this entire district. <br />The County is loolcing at reconstructing the St. Croix Street and Terminal Road between TH 280 <br />and Fulham Street to provide a reliever route for Highway 36. Any Pathway design needs to <br />recognize the new street alignment. <br />Proposed Construction <br />Construct an 8 foot wide bituminous (or concrete) attached pathway on the north side of <br />Terminal Road (County Road B-2), between Cleveland and Walnut Street. <br />The proposed pathway will tie into the existing 6 foot wide bridge shoulder. Due to cost <br />and constraints this portion of the proj ect will require a variance, since the shoulder does <br />not meet Federal design guidelines. <br />Replace existing street lights with pedestrian level ornamental lighting between <br />Cleveland and Long Lalce Road. <br />■ Estimated Pathway Construction Cost = $120,000 ($225,000) <br />County Road B-2 Trail <br />FeasibilityReport <br />May 24,2004 <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.