Laserfiche WebLink
�_$ The Public Worlcs Department must complete the review and approve of the grading, <br />drainage, and utility plans proposed with the General Concept and Final Plan submittal. <br />All plans, including the location of fire hydrants (per Fire Marshal) and utility services <br />connections, require the approval of the Public Worlcs Department. Specifically, <br />Greenhouse Village will be required to connect to Roseville water. <br />1�.9 The on-site parlcing lot for the cooperative proposes 32 off-street visitor parlcing spaces <br />(21 south side and ll north side) which are consistent with the City Code. However, staff <br />suggests the provision of a proof of parlcing agreement that provides an additional 10 <br />spaces should they be deemed necessary by the home owner's association or the City. <br />B. E 4 Prior to the issuance of a building permit, all fire hydrants must be activated to ensure <br />proper safety precautions are in place to protect the structure and construction worlcers. <br />8. I I All buildings, tree branches and roots, debris, and any soil contamination (subj ect to <br />MnPCA requirements) must be removed from the site (not burned on the site) prior to the <br />issuance of a building permit. Soil contamination reports must test for lead and exposure <br />during construction and a plan must be developed to address lead (and other contaminants <br />above the MnPCA standards) in the soil and mitigate to meet MnPCA standards. <br />�_l� The landscapingplan must be revised to include the use of fencing and evergreen trees to <br />screen adjacentresidentialproperties to the east, and incorporatingelements of the <br />Larpenteur Avenue Streetscape Master Plan within the boulevard area. The developer <br />must continue to worlc with adj acent property owners along the east property line on the <br />landscape plan and determine who owns the fencing. <br />�_ 1� Park dedication is required. Staff recommends for this development cash payment in lieu <br />of land dedication. The payment amounts to $7,000 for the town home site and $105,000 <br />for the cooperative site. The parlc fee is placed in the parlc dedication and redevelopment <br />fund. The Parlc and Recreation Commission will review this before final approvals. <br />8, ]� Details must be submitted for review and approval regarding the reuse of the existing <br />greenhouse north of the proposed town homes. <br />�, I� Senior to Family Housing Linlcage Requirement - As a part of the City and Roseville <br />Housing & Redevelopment Authority's program to encourage choice and opportunityin <br />housing, the developers of this proj ect must prepare a marlceting plan that promotes this <br />senior housing proj ect to Roseville residents exclusively for at least 60 days prior to <br />marlceting to the broader community. This has effectively been done through area faith <br />based and senior organizations such as churches and senior centers. The developer must <br />also agree to participate in the Senior Housing Regeneration Program (SHRP) which <br />provides a linlc between single family homes being vacated by seniors and purchased by <br />first time buyers. The developer must promote the SHRP as part of the proj ect sales <br />program and include information regarding the program to each potential purchaser or <br />renter in the project. This relationshipwill help to provide an intergenerationalmix <br />instrumental in achieving a strong neighborhood balance <br />PF3548 — RCA 052404 Page 12 of 13 <br />