My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0614_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0614_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 1:11:39 PM
Creation date
12/14/2009 1:41:34 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compressors. Brine is a salt solution and non compatible with ammonia, oil and any <br />mechanical parts in the compressors. <br />At this time it is somewhat difficultto indicate the extent of the repairs and/or say exactly <br />what the final cost will be for the repairs, but it must be done in a process as' follows: <br />1. Mop up and cleanup of the three compressor units that have been contaminated <br />with the brine solution (please refer to refrigeration company on the scope of the <br />cleanup job). COMPLETED <br />�. Open and inspect the shell and tube chiller and malce necessary repairs (please <br />refer to refrigeration company recommendation letter on the scope of the job). <br />Staff has been attempting to solicit as many quotations as possible from capable <br />and reputable refrigeration companies. The best that can be accomplished is a <br />general estimate for the worlc to be done because the problem is behind the scenes. <br />Meaning dismantling of the Chiller needs to occur first to discover the extent of <br />the malfunction. The estimate of dismantling the chiller system is largely lrnown, <br />however what is inside is not. The estimate that we have received is attached and a <br />summary is as follows: <br />a. Removing the bell ends, removing ammonia <br />L�_ Pressure test Chiller/perform lealc checic <br />c, Reroll tubes in Chiller <br />$18,393 <br />$ 1,630 <br />$4,000 <br />d. Recharging the system with new/clean ammonia $13,655 <br />�. Reassemblingthe Chiller including insulation <br />f. Pressure Test Floor <br />�. Repairing any other issues that may arise <br />Total Best Estimate assuming nothing else surfaces <br />$29,600 <br />$3,729 <br />$ ?? time and materials <br />$71,007 <br />The issue is an unplanned and unbud�eted situation, but is worlc does need to be completed <br />prior to opening for the 2004-OS slcating season. We would anticipate doing the worlc in the <br />above steps beginning in July 2004. <br />Please let me lrnow how you would lilce me to proceed. Thanlc you and if you have any further <br />questions or need clarification, please let me lrnow. <br />� Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.