Laserfiche WebLink
Summary of Positive Comments: <br />Concept 1 <br />• Location of big box / layout of retail (5 comments) <br />• Office at Cleveland/C2, seeking large office tenant <br />(3 comments) <br />• Possible location of communitysheltedsledding hill <br />at southern end of Langton Lake <br />• Possible upscale hotebconf. center at <br />Fairview/'I'errace <br />��Rl�lld� # M�i�l�+�i �G�rtlmen�; <br />Concept2 <br />• Comer of Cleveland/C2 better used for office (5 <br />comments) <br />• Inclusion of big box (2 comments) <br />• Transportationissues due to discontinuous <br />roadway (2 comments) <br />• Parking could be broken up with pedestrian <br />walkways <br />Summary of Negative Comments: <br />Concept 1 <br />. Parkway: coststoo much, poor use of land, detractsfrom <br />c�mmunityJdevelopment, effect on proposed residential, <br />etc. (7 comments) <br />• 35W accesslvisibility (2 comments) <br />. Big box wall could have shops/offices on street <br />. Southeast comer of Cleveland/C2 former wetland <br />. Remodel existing buildingsalong west side of Langton <br />Lake, not replace <br />. Increase width of park on west side of Langton Lake <br />. Proposed residential east of Langton Lake becomes <br />isolated, consideroffice. <br />Summary of Positive Comments: <br />Concept2 <br />• Road layout (10 comments) <br />• Retail layout, big box location, "Costco is good" (9 <br />comments) <br />• High residential use, good placement (6 <br />comments) <br />• General "best scheme" comments (2 comments) <br />• Consider hoteUconf. center as'engine" (5 <br />comments) <br />• Community asset at south end of Langton Lake, <br />could be restaurant(s) (2 comments) <br />�� <br />� <br />. <br />oa:-- -' � <br />�,. , ...�, . �� <br />� <br />�. <br />� <br />