My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0719_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0719_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 3:51:16 PM
Creation date
12/14/2009 1:43:09 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HARRIET ALEXANDER NATURE CENTER/ <br />CENTRAL PARK ELEMENTARY SCHOOL <br />STORM SEWER AGREEMENT <br />An Agreement dated this day of ,2004, by and between the Independent School <br />District No. 623, Roseville, Minnesota, a public school district, hereinafter called "School" and the City <br />of Roseville, Minnesota, hereinafter called "Roseville". <br />WITNESSETH: <br />Whereas, Rosevillewill be constructing a storm sewer system from the westerly property line <br />of Central Park Elementary School through the Harriet Alexander Nature Center/ Central Park and into <br />the City's storm pond, hereinaftercalled the "City Project"; and <br />Whereas, Roseville, with input from the School, has completed plans and specifications for the <br />collection of storm water from Central Park Elementary school parking lot and playing field and <br />reconstruction of a comer of the parking lot, and <br />Whereas, Roseville has prepared plans and specifications and will construct parking lot <br />improvement that conform with the requirements of City of Roseville zoning code; and <br />Whereas, Rosevillewill take bids for the project, prepare an abstract of bids and cost <br />participation summary, award a contract and pay the contractor for the work performed to construct the <br />City Project. <br />NOW. THEREFORE, IT IS MUTUALLY AGREED BY AND BETWEEN THE SCHOOL AND <br />ROSEVILLE AS FOLLOWS: <br />�. Upon award of a construction contract, Roseville shall perform or contract the performance <br />of construction inspection and administration. <br />�, The construction and engineering cost of the City Project is estimated to be $31,616, all of <br />which will be assessed to the School in 2005 over a period not to exceed 15 years at an <br />interest rate of 7%. <br />3. The School shall reimburse Rosevillefor the actual preliminary engineering and design <br />costs needed to prepare plans and specifications for the City Project. This amount is <br />estimated not to exceed $3,700 and is included in the total cost listed above. <br />�. Upon final completion of the work, Roseville will prepare a final cost participation <br />breakdown based on the completed construction contract. <br />5. Roseville shall be responsible for all future maintenance of the storm sewer system <br />constructed under the contract. Parking lot maintenance will remain the responsibilityof <br />the School District. <br />�a. The School and Rosevilleagree to indemnify each other and hold each other harmless from <br />any and all claims, causes of action, lawsuits, judgements, charges, demands, costs, and <br />expenses, including, but not limited to, interest involved therein and attorneys' fees and <br />
The URL can be used to link to this page
Your browser does not support the video tag.