Laserfiche WebLink
Department Approval: <br />� <br />� � <br />REQUEST FOR COUNCIL ACTION <br />Manager Reviewed: <br />� ��' <br />DATE: 07/19/04 <br />ITEM: 4.d <br />Agenda Section: <br />Consent <br />Item Description: Purchase of Refurbished Workstations for City Hall Remodel <br />Background: In the development of the overall project budget for the addition to city hall and <br />the remodel of existing spaces, money was set aside to purchase additional workstations, seating, <br />tables, and miscellaneous furniture. This project is nearly doubling the pre-existing office and <br />public spaces. We have explored available sources for filling these needs and to best accomplish <br />the integration of existing workstations and seating into the overall project. We feel this is best <br />accomplished utilizing existing state contracts that provide the opportunity to refurbish <br />workstations, utilizing the existing inventory of furniture. As spaces are reconfigured in the <br />remodel, as much of the existing workstation components as possible will be reused. Panels will <br />be refurbished with new fabric. We will be making every effort to utilize as muc of the existing <br />as practicable. <br />Financial Implication: We have reserved approximately $300,000 in the overall project budget <br />for furniture and fixtures. This is a relatively low number for a project of this magnitude. Our <br />ability to integrate existing furniture and fixtures with the new is imperative to accomplishing <br />this portion of the project within budget. <br />Recommendation: We recommend the approval of refurbishing existing workstations and <br />purchasing additional refurbished workstations and related filing storage from Alternative <br />Business Systems under existing cooperative state contract for the City Hall remodel. The <br />estimated cost for the workstations, filing, and installation is $127,000. <br />RECOMMENDED COUNCIL ACTION: <br />Motion approving purchase of refurbished workstations for the City Hall remodel, including <br />installation, from Alternative Business Systems for $127,000. <br />Prepared By: Duane Schwartz <br />