My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0726_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0726_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 3:34:23 PM
Creation date
12/14/2009 1:43:14 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,...,r.� <br />� �• � � � :�� ',�� <br />Per the City's request, add to increase the countertop depth in office 192 from 36" to 42". <br />Add $459 <br />As called out on the punch list, cut down two drawers in the island in Room 154. Add $202 <br />� � �� •� • � ►ll► � 1•� � III <br />Alternate # 11 was accepted to delete the fencing on the northeast side of the PW yard. <br />Deduct ($6,800) <br />Alternate #12 was accepted to delete the fencing on the southeast side of the PW yard. <br />Deduct ($7,200) <br />►�• �►�.� �� � ��� �.� �� <br />Metro had quoted aprice of $9,950 to install the wire mesh partitions. This change was not <br />accepted. Add $0 <br />Add to furnish and install 80 L.F. of galvanized angles that had to be added to help support <br />the windows as shown on detail 15/A8,1, Add $1,930 <br />Add galvanized sill angels as shown in PR #12. Add $1,330 <br />Add galvanized lintels and angles as shown in PR #17. Add $330. <br />Add galvanized angle and plate closure as shown in PR #40. Add $830 <br />Add closure plate angles and toe kick angles as called out in PR #44. Add $1,480 <br />Add to remove some temporary hoisting angles at the mezzanine rail in the PW building. <br />This costwill be chargedto the structural steel erector. Add $360 <br />•�:�n �s- , . � � � � - � � �. : - � <br />Add to use mahogany stain in lieu of the clear finish indicated in the specifications. <br />Add $2,230 <br />Add to revise the fabrication drawings for changes at the council chambers millwork per ASI <br />#27. Add $ 225 <br />Furnish and install red oak trim at pocket doors 101 and 112per PR #28, Add $200 <br />Add to revise the fabrication drawings for changes at Room � I�� millwork per ASI #22. <br />Add $210 <br />Delete the mail slot as indicated on the original drawings. (Deduct $25) <br />
The URL can be used to link to this page
Your browser does not support the video tag.