My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0726_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0726_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 3:34:23 PM
Creation date
12/14/2009 1:43:14 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />Chair Mulder expressed concern with impervious surface on the site (less pavement is <br />better). Thomas Paschke explained the proof of parking agreement process. <br />Chair Mulder closed the hearing. <br />Motion: Member Bakeman moved, seconded by Member Pust to recommend approval <br />of a Conditional Use Permit based on the findings of Section 5 and conditions of Section <br />6 of the project report dated July 7,2004, as follows: <br />7.1 <br />72 <br />73 <br />7.4 <br />The site being developed with setbacks as per the site plans in the applications <br />dated June 21,2004. <br />The worship center, lobby expansion and new restroom footprint being limited to <br />8,302 square feet. The basement must be used for storage. <br />The traffic plan being reviewed�revised as per the City's traffic consultants (SEH) <br />recommendations. <br />New signag� being reviewed separately and issued proper sign permits. <br />7.5 The worship center, lobby expansion, and new restroom addition being comprised <br />of brick, integral colored rock faced block, metal trim, and metal or aluminum <br />window and door frames that blend/complement the existing building, or concrete <br />pre-cast panels, architecturally designed to blendlcompliment the existing <br />building. <br />7.6 The sewer and water utilities, grading, sidewalks, paving and driveway access, <br />and storm water drainage plans for the site being reviewed and approved by the <br />Grass Lake Water Management Organization and the Roseville Public Works <br />Department. <br />7.7 The worship center being limited to a maximum height of � feet from grade. <br />7.8 The landscapeplan, screeningplan for the parking lot from residences, and <br />parking lot lighting plan, meeting City Code Section 1010, and prepared by a <br />registered landscape architect, being reviewed and approved by the city landscape <br />architect. <br />7.9 All HVAC, power generation, and trash storage equipment being screened to <br />meet the requirements of City Code Section 1010. <br />Additional/amended conditions: <br />7.10 Canditica� #7 should be amended to read: The worship center being limited to a <br />maximum height of 3 5 feet from grade. <br />
The URL can be used to link to this page
Your browser does not support the video tag.