My WebLink
|
Help
|
About
|
Sign Out
Home
2004_1018_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_1018_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 11:52:28 AM
Creation date
12/14/2009 1:45:40 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D� �a�trn� nt .� � pr���a] : <br />REQUEST FOR COUNCIL ACTION <br />Manager Reviewed: <br />���� � <br />DATE: 10/18/04 <br />ITEM: 5. <br />Agenda Section: <br />Item Description: ����i C���� L� y�/�� ��� �`� �1 <br />,-��J <br />Background: Each �ear the Public Works Department evaluates infrastructure needs based on <br />the City's Pavement Ma�nagement Program and assessment of utility infrastructure. The five- <br />year capital improvement plan is adjusted accordingly to ensure funding of these improvements <br />is in place for construction. The attached spreadsheet and map detail improvements <br />recommended for 2005. We will review each of these projects with you at the work session. <br />The 2005 program incl�des the replacement of the sanitary sewer lift station on Fulham near <br />Midland Hills Country Club. The majority of the cost of this replacement is to be borne by the <br />developer, as it is due tq their request of relocation of this station. The Paper Calmenson <br />Sanitary Lift Station is �roposed to be eliminated due to reconstruction of Highway 280 by <br />Mn/DOT. Staff has be�'n working on an agreement with the City of Lauderdale to allow <br />discharge by gravity to �heir system. Costs for this connection will be covered by the Mn/DOT <br />project. <br />Staff will request the Cquncil at its October ���' meeting to order feasibility studies for the <br />reconstruction of Lovel� Avenue and Chatsworth Street and for South Owasso Boulevard <br />reconstruction. We wil� be following Chapter 429 process for these improvements, as <br />assessments are being proposed. <br />We will review these prpj ects and answer questions at your work sessions. <br />Prepared By: Duane 5lchwartz <br />
The URL can be used to link to this page
Your browser does not support the video tag.