Laserfiche WebLink
Heebink Architectural Woodwork Add $385 <br />Add to remake counter top for reception desk 199. The cabinets had to be moved to cover a <br />tile line in the floor which required a longer counter. See the Heebink letter dated 08/12/04. <br />ADD $385 <br />Twin City Tile and Marble Company Add $1,600 <br />Add for additionalpaver tile, as called out in PR #27. See PR #27 for the cost breakdown. <br />ADD $400 <br />Add for patching tile at toilet room 194 and 195, as called out in PR #60. See PR #60 for the <br />cost breakdown. ADD $1,200 <br />Bartlev Sales Comuanv, Inc. Add �495 <br />Add miscellaneoustoilet accessories. There were two additional paper towel dispensers that <br />were not shown on the drawings and several missing toilet accessories. The portion of the <br />cost associatedwith the missing accessories will be charged to Kellington. ADD $495 <br />Northern Air Corporation Add $9,290 <br />Add to furnish and install a flow switch in the existing elevator equipment room per RFI <br /># 163. This switch had to be added to meet code. See the NAC letter dated 06/28/04. <br />ADD $467 <br />Add to install transfer grills, as called out in PR #53. See PR #53 for the cost breakdown. <br />ADD $996 <br />Add for NAC to install a new auto air vent and new pressure gage while the system was <br />being shut down in the existing building. See the NAC letter dated O1/30/04. ADD $270 <br />Add for Schadegg to remove the flexible ductwork at the existing VAV's and replace with <br />hard-piping. This work was done to maintain the integrity of the system. See the NAC letter <br />dated 06/28/04. ADD $3,313 <br />Deduct to delete the new linear diffusers, as shown on the drawings, and keep the existing <br />diffusers. See the NAC letter dated 06/28/04. (DEDUCT $634) <br />Add to furnish and install the 12" x 72" fire damper between the council chambers and the <br />conference room per PR #58. See PR #58 for the cost breakdown. ADD $1,867 <br />Add to furnish and install thermostats for VAV's at Rooms 137 and 113. ADD $450 <br />Add transfer grills at Rooms 204 and 205, as called out in PR #61. See PR #61 for the cost <br />breakdown. ADD $2,561 <br />Adolphson & Peterson, Inc. Add $599 <br />Add to patch some miscellaneous stone chips caused by unknown trades. ADD $599 <br />