Laserfiche WebLink
Olvmpic Wall Svstems, Inc. Add $13,705 <br />Add to insulate the uninsulated exterior walls between the double "T's' above the ceiling <br />space, which were discovered during the remodel. This work was directed by the City. <br />ADD $3,480 <br />Add some miscellaneous drywall to several locations, as called out in PR #56. See PR #56 <br />for the cost breal{down. ADD $333 <br />Add to insulate the South wall by the "bump-out" area where there was no insulation in the <br />existing exterior wall. This change also included adding some miscellaneous drywall. Both <br />of these items were completed as called out in PR #60, Revision #1. ADD $770 <br />Add to repair the drywall at the first floor demolition areas where the base was removed from <br />the wall, and the paper on the drywall was damaged. This charge will be a backcharge to <br />Kellington Construction. ADD $1,249 <br />Add to repair holes in the wall where there had been furniture mounted. ADD $2,875 <br />Add drywall veneer and taping, as called out in PR #59. See PR #59 for the cost breakdown. <br />ADD $4,998 <br />SteinbrecherPaintin�, Inc. Add �923 <br />Add for painting at the overhead garage doors. The original documents called out for these <br />garage doors to be prefinished, which was not an option for the approved overhead garage <br />doors. See the Steinbrecher letter dated OS/24/04. ADD $310 <br />Add for painting of steel lintels, as called out in PR #44. See PR #44 for the cost breakdown. <br />ADD $193 <br />Add to paint the walls in food prep. Room L144 per PR #54. The original plans did not call <br />out for this room to be painted. SEE PR #54 for the cost breakdown. ADD $300 <br />PR #59 was not approved by the owner, and this work was not done. There is no cost <br />compensation for this change. ADD $ 0 <br />Add to paint the projection screen and some miscellaneous steel, as called out in PR #60. <br />See PR #60 for the cost breakdown. ADD $120 <br />Cosn_ey _Cor�„ Inc. Add $1,919 <br />Add eight (8) Doug Mocket legs to two (2) different cabinets for heat circulation, as called <br />out in PR #62. To do this work, the two (2) cabinets will also need to be uninstalled and <br />reinstalled. See PR #62 for the cost breakdown. ADD $1,919 <br />