i� <br />r <br />I <br />��� <br />Spectra Contract Floorin� Add $4,067 <br />Add to furnish and install VCT in Room L138. See the Spectra letter dated 06/29/04. <br />ADD $985 <br />Add for miscellaneous floor preparation in the remodeled areas on lst and �"`� floors. <br />ADD $3,082 <br />Va1leyCrest Landscape Development Add $7.851 <br />Add an additional nine (9) currents to the original bid. Unit pricing as provided in the <br />original bid has been used. ADD $396 <br />Alternate 4F was accepted by the Council on May 24,2004. ADD $5,200 <br />Alternate 4G was accepted by the Council on May 24,2004. ADD $1,960 <br />Add limestone rock mulch at the PD parking lot. ADD $295 <br />Imperial Developers, Inc. Deduct ($3,156) <br />Add to strip, load and remove overgrowth from additional areas for final landscaping. This <br />work was authorized by the City of Roseville. See the Imperial letter dated 07/15/04. <br />ADD $955 <br />Deduct for work performed by the City to correct the problems associated with the asphalt <br />and class 5 base at the parking and street areas. (DEDUCT $5,000) <br />Additional curb modificationsper the City's request. ADD $889 <br />14'Ii�vMr.�i As�h��i_ _ Add '�f�� <br />Add to repave the drives on the west side of the Public Works Garage due to grade <br />differences. See the Midwest letter dated 08/03/04. ADD $5,015 <br />Deduct for the work that was shown to be completed on the original drawings at the bus <br />shelter area. This work was not completed by Midwest Asphalt. (DEDUCT $2,546) <br />Add to pave the 12'-wide strip on the east side of the Public Works Building. This area was <br />additional to what was called out on the original plans to receive asphalt. ADD $3,645 <br />r � ��_ _-��__--�� __ _ ���__-- -� <br />. -- � - �------� _ <br />Financial Implications: A contingency budget was reserved within the project budget for <br />unforeseen conditions, design problems, and construction complications. There is contingency � <br />remaining to cover these change orders. The project is under budget, with monies reserved for <br />the additional required signage and furnishings. <br />� �����_�� � <br />� �� .�-- Y�� _ <br />