My WebLink
|
Help
|
About
|
Sign Out
Home
2004_1025_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_1025_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 4:22:20 PM
Creation date
12/14/2009 1:45:43 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street and 10 will be using Terrace Drive. The Daily Traffic Volume for the entire <br />projectwill generate 564 total trips, of which 328 will use Arona Street and 236 will use <br />Terrace Drive. The consultants (Glen Van Wormer — SEH) analysis for the entire project <br />is attached along with the analysis from the Presbyterian Homes redevelopment proposal. <br />�_� Required parking for the proposed development will consist of two spaces for each <br />dwelling unit, of which'/z will be required to be covered. In the case of the Phase II <br />proposal by United Properties, town homes will include two garage stalls and six parallel <br />parking spaces are proposed adj acent to the west side of the private drive lane. There is <br />also adequate space to park vehicles behind the garage doors of the eastern most town <br />home structure. <br />r. a Site lighting will be designed to be consistent with the existing and approved style and <br />type of lighting. <br />�.� The placement of inechanical equipment can create visual and noise issues. Given the <br />current Phase II proposal it is assumed that air conditioning units for the town homes will <br />be placed on the ground. As such, these units must be placed on the west side of the units <br />and screened from view. <br />�,5 The City has adequate sanitary sewer, storm water, and water main in place to support the <br />development proj ect. The Public Works Department and the Rice Creek Watershed, prior <br />to Final Development Plan consideration, must review and approve all of these plans. <br />B_� STAFF RECOMMENDATION & CONDITIONS: <br />8. L The City Staff has reviewed the PHASE II proposal by United Properties and <br />recommends approval of the 17 new town home (row home) units and the three actions <br />necessary to begin preparation of fmal documents for permitting. City utility services <br />already serve this site (or are in close proximity) and have adequate capacity to support <br />the new structures. The site planning, landscape architecture, and the architecture are <br />well done with high quality building materials. The proj ect meets the intent and policy <br />directives of the City's Comprehensive Plan and the Arona/Hamline Neighborhood Plan, <br />and is consistent with the developer's Applewood Concept Development Plan approved <br />by the City Council on June 16,2003, which Plan was supported by the Planning <br />Commission on March 5,2003. <br />�_� The following conditions shall apply: <br />a The provision of a 10 foot wide storm sewer force main easement on the south <br />property line, a pathway easement, and an easement for the public overlook. <br />b. The relocation of the proposed retaining wall outside of the storm sewer force <br />main easement. <br />PF3602 RCA 102504.doc Page 7 cf 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.