My WebLink
|
Help
|
About
|
Sign Out
Home
2004_1108_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_1108_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 1:46:47 PM
Creation date
12/14/2009 1:45:51 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Manager's Report <br />Friday, September 3,2004 <br />Page 5 of 6 <br />5. Buildin� Project. When this City Manager Report reaches you on <br />Friday, September 3rd, our Building Project will be substantially complete. <br />Though all the final <br />numbers are not in yet, <br />Duane Schwartz and <br />McGough and Ankeny <br />Kell and about 50 <br />contractors and roughly <br />200 suppliers will have <br />delivered this Project to <br />you and the community <br />ahead of schedule and <br />below budget. (We will <br />provide you with a final <br />accounting in about 60 <br />days.) <br />City staff will be moving into their refurbished work areas next <br />week. If you would like an individual tour of the completed Project, just <br />let me or Duane or Margaret know. There will also be opportunities for <br />escorted tours at the City's Open House on Saturday, September 18". <br />Note that I said the Project is "substantially complete." Some details <br />and some warranty items will linger for a while. For example, <br />. The new presentation table in the council chambers will not be in- <br />stalled until after your first council meeting in the refurbished <br />council chambers on Monday, September 13". We are now told the <br />new presentation table will be installed around September 15". At <br />your September 13th meeting we will use a separate microphone and <br />Elmo setup for public input. <br />. Interior and exterior signage still needs attention. Interior signage <br />identifying each department and meeting room will be installed be- <br />fore the Open House. Exterior attached and detached signage will <br />be constructed within the next month or so. <br />Otherwise, all life safety construction issues are complete. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.