Laserfiche WebLink
Cit of Roseville <br />Y <br />Proposed Schedule of Fees and Charges for Service <br />Effective January 1,2005 <br />(minimum charge — one-half hour) <br />Additional plan review required by changes, additions <br />or revisions to plans .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..$48.41 per hour <br />(minimum charge — one-half hour) <br />For use of outside consultants for plan checking, inspections <br />andsimilar costs ................................................................ ..........s--••,-----,._...A�Rw�� costs� <br />tlVIUGIA GVSLS L1GIUUG AU1111LLLSL1ALIVG AllU VVGll1GAU GVSLS. <br />Demolition Permit Fee: <br />Tenant improvement/remodeling prior to building permit �5 L-S� <br />Structures not connected to utilities �� i,�� <br />Structures connected to city utilities .� I��.�� <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safe . Inspection Fee: <br />An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. I���, �- l3-��1�1�� eff. 5-1-2000) <br />Gradin�/Excavation Permit Fee: <br />Gradin Plan Review Fee <br />50 cubic ards or less .. ........................................................................ No fee <br />51 to 100 cubic ards or less. . .$24.20 <br />............................................................... <br />101 to 1,000 cubic ards. .$38.11 <br />.................... . ............................................... <br />1,001 to 10,000 cubic ards. .$50.72 <br />................................................................. <br />10,001 to 100,000 cubic yards —$50.72 for the first 10,000 cubic yards, plus $25.24 for <br />each additional 10,000 ards or fraction thereof. <br />100,001 to 200,000 cubic yards —$277.84 for the first 100,000 cubic plus $13.65 for each <br />additional 10,000 cubic ards or fraction thereof. <br />200,001 cubic yards or more —$41432 for the first 200,000 cubic yards, plus $7.47 for <br />each additional-10 000 cubic vards or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />minimum char e — one-half hour .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................$52.00 er hour <br />,� <br />� <br />