Laserfiche WebLink
Cit of Roseville <br />Y <br />Proposed Schedule of Fees and Charges for Service <br />Effective January 1,2005 <br />Gradin Permit Fee <br />50 cubic yards or less ... . .. . .. .. . .. ... .... . .. ... .. . ...... ... . .. ... .. . .. . .. . .. . .. . .. .. . .. . .....$24.20 <br />51 to 100 cubic ards.., ..$38.11 <br />101 to 1,000 cubic yards —$38.11 for the first 100 cubic yards, plus $18.02 for each <br />additional 100 cubic ards or fraction thereof. <br />1,001 to 10,000 cubic yards —$20033 for the first 1,000 cubic yards, plus $14.94 for <br />each additional 1,000 cubic yards or fraction thereof. <br />10,001 to 100,000 cubic yards —$334.75 for the first 10,000 cubic yards, plus $67.98 for <br />each additional 10,000 cubic yards or fraction thereof. <br />100,001 cubic yards or more —$946.57 for the first 100,000 cubic yards, plus $37.60 for <br />each additional 10,000 cubic ards or fraction thereof. <br />Other Inspections and Fees <br />1. Inspections outside of normal business hours ... . .. . .. . .. ... .. . .. . .. . .. . ...$52.00 per hour <br />(minimum charge — one-half hour) <br />2. Reinspection fees ... .. . . .. . .. . . . .. . .. . .. . . .. . .. ... .. . .. . .. . ... .... .. . .. . ... .....$52.00 per hour <br />3. Inspections for which no fee is specifically indicated ... ... ... ... ... ... .. .$52.00 per hour <br />(minimum charge — one-half hour) <br />InvestigationFee: Work without a Permit <br />Whenever any work for which a permit is required from the city has been commenced without <br />first obtaining said permit, a special investigation shall be made before a permit may be issued <br />for such work. An investigation fee, in addition to the permit fee, shall be collected whether or <br />not a permit is then or subsequently issued. The investigation fee shall be equal to the amoun.t of <br />the permit fee required by this code. The payment of such investigation fee shall not exempt any <br />person from compliance with all other provisions of this code nor from any penalty prescribed by <br />law. <br />Manufactured Home Permit Fee: <br />New installation <br />Mechanical Permit Fee: <br />Residential <br />Air conditioning — new <br />Air conditioning — replacement <br />Warm air furnace — new <br />Warm air furnace — replacement <br />Hot water boilers — new <br />Hot water boilers — replacement <br />Unit heaters <br />Swimming pool heaters <br />Miscellaneous work & gas piping <br />�I ��,�� <br />$36.00 <br />$36.00 <br />$77.25 <br />$41.20 <br />$77.25 <br />$41.20 <br />$41.20 <br />$41.20 <br />1.25 % of estimated job cost <br />d <br />