Laserfiche WebLink
Cit of Roseville <br />y <br />Proposed Schedule of Fees and Charges for Service <br />Effective January 1,2005 <br />Refund Fee: <br />The building official may authorize refunding of any fee paid hereunder which was erroneously <br />paid or collected. <br />The building official may authorize refunding of not more than 80 percent of the permit fee paid <br />when no work has been done under a permit issued in accordance with this code. <br />The building official may authorize refunding of not more than 80 percent of the plan review fee <br />paid when an application for a permit for which a plan review fee has paid is withdrawn or <br />canceled before any plan reviewing is done. <br />The building official shall not authorize refunding of any fee paid except on written application <br />filed by the original permittee not later than 180 days after the date of fee payment. <br />Sewer Connection Permit Fee: <br />Residential <br />Commercial <br />Repair <br />Disconnect <br />Sign Permit Fee: <br />Utilize building permit fee schedule <br />No plan review fee <br />Minimum fee <br />Swimming Pool Permit Fee: <br />Utilize building permit fee schedule <br />Water Connection Permit Fee: <br />Residential <br />Commercial <br />Repair <br />Disconnect <br />Land Use Permit Fee (Fences, Walls, Sheds. Drivewa,�, Draintile S, s�l: <br />Utilize building permit fee schedule <br />No plan review fee <br />Minimum fee <br />��i_�� <br />� � ��_�� <br />���a.�� <br />��1.�� <br />���.� <br />��l.�C� <br />�1Q�.�{.F <br />���,� <br />��] _�I� <br />��fa.�� <br />