Laserfiche WebLink
Cit of Roseville <br />y <br />Proposed Schedule of Fees and Charges for Service <br />Effective January 1,2005 <br />Minimum fee <br />Gas fireplace <br />Commercial <br />All commercial work <br />Movin� Permit Fee: <br />Over private property only <br />Over public streets <br />Investigation fee <br />Plumbing Permit Fee: <br />Administrative/minimum fee <br />Plus, for each fixture opening <br />Miscellaneous work <br />Backflow prevention verification <br />�3 �,�} <br />S�l,�� <br />1.25 % of estimated job cost <br />S� ] ,�� <br />�1��,� <br />$��. U�lhr�ur <br />$36.00 <br />$8.25 <br />1.25 % of estimated job cost <br />$20.60 <br />Plan Review Fee: <br />When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all buildings, except for construction costs in R-1 and R-2 <br />zones which do not involve new single family structures and are of less than fifteen thousand <br />dollars ($15,000.00), shall be s�ty five percent (65°/o) of the building permit fee as set forth in <br />Section ��1.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. 1110, 4-13- <br />1992) <br />The plan review fees specified are separate fees from the permit fees specified and are in <br />addition to the permit fees. <br />When submittal documents are incomplete or changed so as to require additional plan review or <br />when the project involves deferred submittal items an additional plan review fee shall be charged <br />at the above rate. <br />Expiration of plan review. Applications for which no permit is issued within 180 days following <br />the date of application shall expire by limitation, and plans and other data submitted for review <br />may thereafter be returned to the applicant or destroyed by the building officiaL The building <br />official may extend the time for action by the applicant for a period not exceeding 180 days on <br />request by the applicant showing that circumstances beyond the control of the applicant have <br />prevented action from being taken. No application shall be extended more than once. In order to <br />renew action on an application after expiration, the applicant shall resubmit plans and pay a new <br />plan review fee. <br />