My WebLink
|
Help
|
About
|
Sign Out
Home
2000_0424_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2000
>
2000_0424_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 3:24:10 PM
Creation date
12/14/2009 1:49:31 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUUNTY RUAD D CUNSTRUCTIUN AGREEMENT <br />BETWEEN THE CITIES OF SHOREVIEW AND ROSEVILLE <br />� <br />� <br />� <br />� <br />An Agreement dated this � day of 2000, by and between the City of Shoreview, <br />Minnesota, hereinafter called "Shoreview" and the City of Roseville, Minnesota, hereinafter called <br />"Roseville". <br />WITNESSETH: <br />Whereas, Roseville will reconstruct County Road D from Victoria Street to Avon Street in <br />2000, hereinafter called the "City Proj ect"; and <br />Whereas, the portion of the City Project between Victoria Street to Avon Street is located on <br />the boundary between Shoreview and Roseville; and <br />Whereas, Roseville has prepared plans and specifications and will reconstruct both the north <br />side (Shoreview) and south side (Roseville) of County Road D in 2000; and <br />Whereas, Roseville will take bids for the project, prepare an abstract of bids and cost <br />participation summary, award a contract and pay the contractor for the work performed to <br />construct the City Proj ect <br />NOW. THEREFORE, IT IS MUTUALLY AGREED BY AND BETWEEN SHOREVIEW AND <br />ROSEVILLE AS FOLLOWS: <br />1. Upon award of a construction contract, Roseville shall perform or contract the <br />performance of construction inspection and administration. <br />2. The construction cost of the City Project is estimated to be $20,375. Of this total, <br />$10,187.50 is for improvements to be paid for by Roseville and $10,187.50 is for <br />improvements to be paid by Shoreview as detailed in Exhibit A. <br />3. Shoreview shall reimburse Roseville twelve percent (12%) of its share of the construction <br />cost, as determined by the final amount due to the contractor, as a construction <br />engineering fee (Estimated to be $1,222.50). <br />4. Upon final completion of the work, Roseville will prepare a final cost participation <br />breakdown based on the completed construction contract Shoreview agrees to pay <br />Roseville any amount due within 90 days from the date of an invoice from Roseville. In <br />the event that Shoreview has advanced funds greater than is due, Roseville shall refund <br />the amount to Shoreview without interest. <br />5. Shoreview shall be responsible for all future maintenance of all items constructed under <br />the contract located on the north side of the roadway. Roseville shall be responsible for <br />all future maintenance of all items constructed under the contract located on the south <br />side of the roadway. <br />6. Shoreview and Roseville agree to indemnify each other and hold each other harmless <br />from any and all claims, causes of action, lawsuits, judgements, charges, demands, costs, <br />and expenses, including, but not limited to, interest involved therein and attorneys' fees <br />
The URL can be used to link to this page
Your browser does not support the video tag.