My WebLink
|
Help
|
About
|
Sign Out
Home
2009_1221_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_1221_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 3:19:22 PM
Creation date
12/18/2009 2:45:29 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ A feasibility report will detail the proposed design, neighborhood impact, estimated cost and <br />. proposed funding for the construction of these public improvements. Consistent with Ramsey <br />. County's cost sharing policy, a portion of the street reconstruction costs will be charged to the <br />� City of Roseville. It is the City's policy to assess adjacent property owners for up to 25% of the <br />City of Roseville's cost for County Projects. <br />FINANCIAL IMPACTS <br />� Financing is 60% in place. If the financing does not all fall into place, the project will be pushed <br />� to 2011. The cost for this project is estimated at $25 million dollars. At this time, $417,300 of <br />� that cost has been allocated to the City of Roseville. <br />� STAFF RECOMMENDATION <br />Order Preparation of a Feasibility Report for the Rice Street/ TH 36 Sridge Reconstruction <br />Project. <br />REQUESTED COUNCIL ACTION <br />� Approve Resolution Ordering Preparation of Feasibility Report for the Rice Street/ TH 36 <br />Sridge Reconstruction Project. <br />Prepared by: Debra Bloom, City Engineer <br />Attachments: A: Resolution <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.