Laserfiche WebLink
and in the contract. Substandard performance as determined by the <br />City will constitute non-compliance and subject Contractor to <br />penalties as specified in the RFP Section 8.05 Liquidated Damages. <br />If action to correct such substandard performance is not taken by the <br />Contractor within 60 days after being notified by the City, the City will <br />initiate the contract termination procedures. <br />The City shall have the right, during the term of the Contract, to have <br />a representative on Contractor's premises to monitor the operation <br />of the Contract. Such representative shall provide reasonable notice <br />to the Contractor, only be allowed on Contractor's premises during <br />normal business hours and follow all the Contractor's safety <br />procedures. <br />4. Estimatinq Materials Composition as Collected: The Contractor shall <br />conduct at least one materials composition analysis of the City's <br />recyclables each year to estimate the relative amount by weight of <br />each recyclable commodity by grade. The results of this analysis <br />shall include: (1) percent by weight of each recyclable commodity by <br />grade as collected from the City; (2) relative change compared to <br />the previous year's composition; and (3) a description of the <br />methodology used to calculate the composition, including number of <br />samples, dates weighed, and City route(s) used for sampling. The <br />Contractor shall provide the City with a copy of each analysis. <br />5. Estimatinq Process Residuals: The Contractor shall provide the City <br />a written description of the means to estimate process residuals, as <br />defined in the RFP Section 4.29, derived from the City's recyclables. <br />This written description shall be reviewed and approved in writing by <br />the City. This written description shall be updated by the Contractor <br />immediately after any significant changes to the processing facilities <br />used by the Contractor. <br />VI. Compensation <br />1. Compensation to Contractor: City agrees to pay Contractor $2.10 per <br />residential dwelling unit per month in 2006 for bi-weekly curbside <br />collection, processing and marketing of recyclables. For 2006 the <br />City certifies that there are 9,366 curbside units that will receive <br />service. The City will notify the Contractor by December 1 of each <br />year what the certified number of curbside units will be for the <br />subsequent year. <br />0 <br />