Laserfiche WebLink
City of Roseville <br />Proposal BL-08-02387G <br />January 26, 2010 <br />Page 3 <br />• Summary of the environmental field-screening results <br />• A sketch identifying the soil boring and sampling locations <br />. Soil boring logs describing stratigraphy <br />. A description of sampling methods and procedures used <br />• Discussion of the soil and groundwater analytical results <br />• Conclusions and recommendations regarding our findings <br />One original and two copies of our final summary report will be submitted to you unless we are <br />directed to do otherwise. Further, copies of the final summary report will be submitted to the MPCA <br />VIC and PB Programs. <br />Please note that if further indications of soil or groundwater impacts are encountered during the <br />assessment, the MPCA may require additional assessment of the Site to evaluate the full extent and <br />magnitude of the soil and/or groundwater contamination, and what type of remedial activities, if any, <br />should be conducted. Therefore, the Scope of Services for the proposed subsurface evaluation may <br />not adequately define the extent of contamination that may be present at the Site. <br />Quality Assurance/Quality Control <br />Braun Intertec is currently certified to conduct inorganic and organic laboratory analyses by the <br />Minnesota Department of Health, the Wisconsin Department of Natural Resources and the North <br />Dakota State Department of Nealth. <br />All chemical analyses will be performed according to methods published by the United States <br />Environmental Protection Agency or other authoritative sources. The quality assurance program <br />at Braun Intertec has been designed to generate laboratory data that are both accurate and <br />consistent. To maintain a high level of performance, quality-control assessment is used to monitor <br />both precision and accuracy of the instruments and analyses. The examination of routine blanks, <br />sample duplicates, spikes and standards highlight areas of each analytical procedure where <br />preventive and/or corrective measures will be most effective. A copy of our Quality Assurance <br />Manual is available for your review upon request. <br />Utility Clearance <br />Braun Intertec or our subcontractor will contact Gopher State One Call and request that they <br />make arrangements for the appropriate public utility companies to determine the locations of <br />public underground utilities at the Site. We request that the property owner or their authorized <br />representative immediately notify the Braun Intertec project manager of the presence and locations <br />of any underground objects that are not the responsibility of public utility companies. Braun Intertec <br />will take reasonable precautions to avoid damaging underground objects. In authorizing this <br />contract, the property owner and/or their agent agrees to waive any claim against Braun Intertec and <br />will indemnify and hold Braun Intertec harmless from any claim of liability, injury or loss allegedly <br />arising from us damaging underground objects not called to our attention prior to beginning the <br />work. <br />eRauN <br />INTERTEC <br />