Laserfiche WebLink
City of Roseville <br />Proposal BL-08-02387G <br />January 26, 2010 <br />Page 4 <br />Amended VRAP/CCP <br />In addition to the subsurface evaluation summary report, Braun Intertec will provide an amended <br />VRAP/CCP to the MPCA VIC and PB Programs for the second phase of the Twin Lakes roadways <br />construction project (Twin Lakes Parkway) following receipt of comments from the MPCA on the <br />adequacy of the subsurface evaluation. <br />One original and two copies of the amended VRAP/CCP will be submitted to you unless we are <br />directed to do otherwise. Further, copies of the VRAP/CCP will be submitted to the MPCA VIC and PB <br />Programs given your approval. <br />Schedule <br />Based on our current schedule, we will be able to begin the scope of services within approximately <br />two weeks of receipt of your authorization. Approximately 2 days will be required to conduct the soil <br />borings. Standard turnaround time on environmental laboratory analyses for this project is about 10 <br />working days. A draft of our written subsurface evaluation summary report will follow within 8 days <br />after receiving the analytical results. The report will remain in draft status until we are notified from you <br />to proceed with issuance of the final report. <br />Costs <br />We will furnish the services described herein on an hourly and unit cost basis. Based on our current <br />understanding of the Site conditions and the assumptions stated in this proposal, we project the total <br />cost to perform the Scope of Services will be about $16,260. Although the actual cost may be more or <br />less than the estimated cost, the estimated cost will not be exceeded without additional authorization <br />from you. The estimated cost breakdown by activity is listed below. <br />Service Description <br />Drilling Services <br />Staking of Borings and Proposed Utilities (using GPS) <br />Private Utility Locate Contractor <br />Field Screening and Sampling (includes staff, vehicle, and field equipmentJ <br />Laboratory Analyses (see Scope of Services for detailsJ <br />Soi) Samples <br />Groundwater Samples <br />Project Coordination and Investigation Summary Report <br />Prepare Amended VRAP/CCP and Correspondence with MPCA <br />Estimated Project Total <br />Cost Estimate <br />$2,600 <br />400 <br />250 <br />1,450 <br />3,870 <br />1,290 <br />3,400 <br />3,000 <br />$16,260 <br />BRauN <br />I NTE RTEC <br />