My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2010_0111
Roseville
>
City Council
>
City Council Meeting Minutes
>
201x
>
2010
>
CC_Minutes_2010_0111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2010 3:37:57 PM
Creation date
2/12/2010 3:37:54 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
1/11/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/11/2010 <br />Phase 1 Public Improvements <br />^ Construction of Twin Lakes Parkway from <br />Cleveland Avenue to Mount Ridge Road <br />o Construction of Mount Ridge Road from <br />County Road C2 to Twin Lakes Parkway <br />o Installation of the westerly roundabout at Twin <br />Lakes Parkway and Mount Ridge Road <br />o Installation of public utilities-sewer, water, <br />stormwater <br />o Installation of landscaping <br />Phase 1 Infrastructure .Project <br />^ Nearly entire project has been <br />completed <br />o Water, sewer, and storm water <br />utilities in place <br />o Roadways constructed <br />o Landscaping underway <br />n Remaining work <br />a Construct concrete crosswalks <br />at roundabout <br />o Pave final lift of asphalt on Twin <br />Lakes Parkway <br />o Finish landscaping-trees, <br />shrubs, perennials <br />y ~ <br />,``.~ ~.. <br />Phase 2 Infrastructure Project <br />'_;f <br />`t <br />~: ~. <br />~~.. <br />Phase 2 Improvements <br />e Extend Twin Lakes Parkway from <br />the Mount Ridge roundabout east <br />to Prior Avenue <br />c Construct a roundabout at Twin <br />Lakes Parkway and Prior Avenue <br />n Reconstruct Prior Avenue from Twin -•k' <br />Lakes Parkway to County Road C <br />~ Construct a signal at the ~' <br />intersection of Prior and County <br />Road C ~ ,!. <br />c. Associated utility extensions, <br />including sanitary sewer, water <br />main and storm sewer <br />Phase 2 Design and Planning <br />o Final design and planning will be finished by <br />February <br />^ Braun Intertec is working with the PCA on a <br />Response Action Plan (RAP) <br />v RAP has been submitted, but not approved <br />c~ Will most likely need to undertake additional soil <br />and groundwater analysis <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.