My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2010_0111
Roseville
>
City Council
>
City Council Meeting Minutes
>
201x
>
2010
>
CC_Minutes_2010_0111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2010 3:37:57 PM
Creation date
2/12/2010 3:37:54 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
1/11/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/11/2010 <br />• <br />• <br />C7 <br />Phase 2 Cost Estimates <br />^ - ~~ <br />on seoo,ooo <br />Site pr+eperaGon 553,500 <br />`~~ aear,uc , _ s~oreoo <br />Sanitary sewer 553,700 <br />worm-sewer StOt),Z00 <br />Wainer main 5129,700 <br />;Paws( IhMe buAal 51 W,WO <br />Road and sidewalk 51.035,300 <br />`~ SS+W.200 <br />Cortstnx:tlon oversite S192,200 <br />7ota4 53,00=,300 <br />Phase 2 Timeline <br />^ February 2010: Approve plans and <br />specifications and order the advertisement for <br />bid <br />^ April 2010: Award bids <br />^ May 2010: Begin construction <br />^ September 2010: Complete construction <br />Upcoming Council Actions <br />^ DEED grant contract <br />^ Phase 1 land acquisition settlements <br />o Change orders and consultant contract <br />amendments for Phase 1 work <br />^ Cost allocation study update <br />^ Approve plans and authorize bids for Phase 2 <br />Phase 2 Funding <br /> <br />.: <br />To;tl Cost <br />i9.0iZ.5110; <br />Prevbusy Funded Land AcquislUon (E770,o00) <br />DEEDIisdevebpmeraGrent ($1,000,Q00) <br />Ramsey County ERF Grant ($180,600) <br />'RamslMnp To t3a Funded - =1,171;7!06 <br />Cost Allocation Study <br />^ In 2007, Council adopted the Twin Lakes Cost <br />Allocation Study as a means to distribute <br />infrastructure mitigation elements of the AUAR to <br />new development <br />^ .Staff will be revising the costs projections, which <br />will include: <br />n Factoring in actual and new projected costs <br />o Adding environmental cleanup (ROW only) cost for <br />those areas where cleanup has occurred <br />o Reducing the overall projected cost with grant funds <br />that have been received <br />Summary <br />^ Significant accomplishments occurred in 2009 <br />^ Preparing to undertake Phase 2 improvements <br />in 2010 <br />^ Staff will be bringing requests for action to <br />Council as need <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.