Laserfiche WebLink
Stamped red-color herrin�bone concrete crosswalk <br />Paragon <br />Q3 <br />Curbmaster <br />Kassa <br />Goodmanson <br />2009 bid was $8.95 s.f. <br />Remove and replace concrete panels in PW Yard <br />Kassa <br />Q3 <br />Curbmaster <br />Goodmanson <br />Paragon <br />2009 bid price $4.60 s.f. <br />Pedestrian ram� truncated domes <br />Paragon <br />Curbmaster <br />Kassa <br />Goodmanson <br />Q3 <br />2009 bid price $14.00 s.f. <br />5275 s.f. concrete sidewalk <br />Kassa <br />Curbmaster <br />Q3 <br />Paragon <br />Goodmanson <br />225 s.f. 2147 Fernwood <br />Curbmaster <br />Q3 <br />Kassa <br />Paragon <br />Goodmanson <br />625 s.v. LVWE45030B �/z" Acorn Park Pavin� <br />T. A. Schifsky <br />Tower Asphalt <br />Ace Blacktop <br />Bituminous Roadways <br />Paragon <br />Midwest Asphalt <br />$7.70 s.f. <br />$8.75 s.f. <br />$935 s.f. <br />$9.95 s.f. <br />$13.60 s.f. <br />$4.65 s.f. <br />$525 s.f. <br />$5.35 s.f. <br />$5.95 s.f. <br />$7.75 s.f. <br />$6.48 s.f. <br />$725 s.f. <br />$15.00 s.f. <br />$16.00 s.f. <br />$1735 s.f. <br />$2.80 <br />$2.90 <br />$3.55 <br />$3.74 <br />$4.48 <br />$3.45 s.f. <br />$525 s.f. <br />$5.50 s.f. <br />$10.88 s.f. <br />$12.75 s.f. <br />$70.00 ton <br />$71.00 ton <br />$83.00 ton <br />$90.00 ton <br />$100.48 ton <br />$117.50 ton <br />Page 3 of 5 <br />