My WebLink
|
Help
|
About
|
Sign Out
Home
2008-03-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2008
>
2008-03-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 12:26:03 PM
Creation date
3/23/2010 10:04:27 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/25/2008
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />March, 2008 <br />as necessary. Manholes located in easements or off paved road areas can be large sources of direct inflow and <br />should be inspected for flooding potential and damaged rings, Sump Pumps are also considered a direct <br />inflow source and they will generate a significant flow spike so a survey in these areas will provide some useful <br />information as well as providing a "complete" inspection. <br />Inflow defects that are identified should be repaired as soon as feasible after identification to reduce the <br />inflow as much and as quickly as possible. This will reduce the MCES treatment charges as well as assist in <br />further evaluation of the system since other defects may become evident when some of the flow is removed. <br />These investigation recommendations are a starting point and problems identified or defects noted may <br />require additional investigation or other unique investigative techniques. The results of each procedure should <br />be reviewed and evaluated to determine the next step in the investigative effort. <br />VIII, Schedule <br />A. 2008 Plan <br />o Insta(I additional flow meters for peak wet weather period to attempt to capture several rainfall <br />events <br />o Calibrate pumps at Dale Street Lift Station (#4), Galtier Lift Station (#5), Cleveland Lift Station <br />(#9), and Fernwood Lift Station (#13). <br />o Evaluate flows from each lift station area and calculate parameters such as those in Table 5. <br />o Smoke test area around Fairview Avenue ,Snelling Avenue, and Hwy 36. <br />o Conduct physical survey of manholes located in "off-road" locations <br />o Complete rehabilitation of any identified manhole inflow sources <br />o Televise a portion of the collection system <br />o Experiment with televising sewer service lines in 10 - 20 locations <br />2009 Plan <br />o Continue flow metering sub- areas as necessary to isolate sources <br />o Conduct sump pump surveys of 33 % of the sewer service area. <br />o Conduct physical survey of manholes located in "off-road" locations <br />o Complete rehabilitation of any identified manhole inflow sources <br />o Follow up on sewer service line inspection based on experience from 2008 <br />o Continue flow evaluation <br />C. 2010 Plan <br />o Conduct sump pump surveys of 33% of the sewer service area <br />o Continue flow evaluation <br />o Consider sewer replace programs if defective services are identified. <br />D, 2011 Plan <br />o Conduct sump pump surveys of remaining sewer service area <br />o Compiete any remaining rehabilitation projects <br />Page 11 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.