My WebLink
|
Help
|
About
|
Sign Out
Home
2009-04-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2009
>
2009-04-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2010 2:28:01 PM
Creation date
3/23/2010 2:26:52 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/28/2009
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pickup. He suggested that more standing room for children might help the <br />problem. such as constructing a shelter or waiting area. <br />School bus pickup and emergency vehicle access is a major concern that needs to <br />6e dealt with. <br />The County Road B2 and Rice will have dual Lefts, becoming a major <br />intersection. There are 2 public streets that will not have full access. City staff <br />has identified this as a concern. <br />Changing lane widths is something to be considered. Pedestrian crossings are <br />also a concern. <br />On April 13 there is a review of these concepts and comments with the City <br />Council and then sent to Ramsey County. Hopes are that it will be taken to City <br />Council. next month, finish the environmental review, and then move right into <br />final design with the potential of construction in summer of 2010. <br />6. Update on TH 280 project <br />Deb Bloom reports that 1VIn Dot is completing final plans and the bid opening will <br />be May 15. There are two projects to be done this summer. One of them is the <br />Larpenteur Ave bridge replacement as a separate contract by the State with a bid <br />opening at the end of the month. <br />The Larpenteur Ave interchange is located in Lauderdale with the west side being <br />in the City of Minneapolis. Utility work is being done now. The Broadway <br />intersection to open access to the Minneapolis industrial business park area. The <br />signal will in place mid-May. The intersection will be reopened as a 3/ <br />intersection. 'T'he Hwy 2$0 part itself will start in September. The Larpenteur <br />portion will not be completed by State Fair. <br />The City of Roseville has a lift station in this area. This station only serves Paper <br />Calmenson. We are proposing a gravity sewer which connects into the Lauderdale <br />system. Sanitary sewer is being sized for redeveloped Paper Calmenson. Plans <br />are being reviewed by the State. It is going out to bid in May and completed by <br />September. <br />Member Willenbring asked if costs are shared by adjacent property owners for <br />this sanitary sewer. Deb Bloom explained that the signal elimination severely <br />compromised the lift station maintenance. Because of our easement on the right- <br />of-way, Mn Dot agreed to relocate and pay costs of $350,000. To construct the <br />line and fees associated with the Lauderdale connection.. An easement needs to <br />be negotiated with the property owner which should be at no cost to the City. The <br />frontage road will be completely reconstructed with. a permanent barrier. <br />At the west end of County Road B, a center barrier will be constructed and a <br />portion of the road up to the apartments will be removed. It will appear as a <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.