My WebLink
|
Help
|
About
|
Sign Out
Home
2009-07-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2009
>
2009-07-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2010 2:36:32 PM
Creation date
3/23/2010 2:35:58 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/28/2009
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Communication Items <br />Construction Update <br />Duane Schwartz mentioned the construction updates that were given to the <br />commission members. One project is the Roselawn project which is continuing <br />with utility work and curb and gutter work. <br />Duane Schwartz announced the City Council awarded the bid for the Twin Lakes <br />project to Eureka Construction in Lakeville. The contractor has started with tree <br />removal just south of County Road C2. <br />Duane Schwartz mentioned the Snelling Avenue MnDOT project is underway <br />with some delays. There will be some additional road closures. <br />Duane Schwartz mentioned that Ramsey County has completed the mill and <br />overlay on County Road B west of Snelling. Rice Street has also been milled and <br />will be paved later in the week. <br />Member Stenlund mentioned the contractor for the Roselawn project has not been <br />protecting inlets properly and have made it very difficult for the public to get <br />through. He suggested the commission take a field trip out to the site to see first <br />hand what is happening to the road. <br />Member Vanderwall asked Duane Schwartz how the Twin Lakes bid outcome <br />was compared to what he was expecting. Duane Schwartz responded it was 16% <br />under the engineer's estimate. The City Council did award two of the alternates. <br />One was the building demolition and the other was to have the storm water reuse <br />facility connected to Roseville's SCADA to be monitored remotely. Duane <br />Schwartz mentioned the Public Works staff decided to stay with the LED lighting <br />for the project. The staff also chose to not accept the alternate raingarden <br />landscaping proposed for the project due to the uncertainty of where driveways <br />would go. <br />Member Stenlund asked if it would be possible for the commission to go hear <br />someone talk about or for someone to come and talk to them about porous <br />concrete that Shoreview is using. Member Stenlund stated he is interested in the <br />process of how this is used and feel this could possibly have future applications in <br />the City of Roseville. <br />Member Vanderwall suggested having photographs taken instead of the members <br />going out to see the prof ect in person since things are changing each day on the <br />project. <br />Duane Schwartz mentioned a water main project that was bid on a year ago but <br />the bids were rejected. The project will be out for bid again this year with a <br />different approach. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.