My WebLink
|
Help
|
About
|
Sign Out
Home
2009-10-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2009
>
2009-10-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:21:48 PM
Creation date
3/23/2010 2:45:06 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/27/2009
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Homes along Oxford will be connecting to the <br />existing water main in Oxford Street. Start installing <br />S2NICeS. <br />° Churchill- The mainline crew will start installing the <br />water main along the west side of the street. <br />° Lexington- Once the water main on Churchill is <br />installed, the mainline crew will move on to install the <br />water main on the east side of the street. <br />Week starting 10/19: <br />° Churchill/ Lexington- The service crew will identify <br />the path and boring pit locations for the new <br />services. Start installing services. <br />° Test mainline water pipe. <br />° Connect new mainline water pipe to City system. <br />Week starting 10126: <br />° Start connecting homes along the west side of <br />Oxford Street to the existing water main. <br />Week starting 11/2 <br />° Start connecting homes along Churchill and <br />Lexington to the new water main. <br />Project Schedule: The Contractor will have the <br />new water main operational and the old main <br />abandoned by November 26th, 2009. Due to the <br />lateness in the year, it is likely that some of the <br />restoration will not be completed until June, 2010. <br />Service Connection Work: We have asked that <br />the contractor mark the location of boring pits on <br />private property at least 48 hours in advance of <br />starting work on service installation. If you have <br />questions about your service connection, please <br />contact Dean Findell, Project Coordinator. <br />The Contractor will notify you at least 24 hours in <br />advance of switching your home over to the new <br />watermain. During the time that your service is <br />switched over you will not have water. This should <br />be less than 4 hours. We recommend that the first <br />time you use your water after being reconnected <br />that you run your faucet for one or two minutes to <br />clear the line. <br />Utility Locates: To protect against underground <br />utility damage, the Contractor will be calling in utility <br />locates. This is required for anyone digging a hole, <br />whether it is to plant a tree or replace watermain. <br />Xcel Energy, Comcast and Qwest will locate their <br />underground utilities by spray painting and placing <br />flags in the boulevard. Please do not remove these <br />flags. <br />Access; Contractors are required to keep the <br />roads passable and provide driveway access <br />whenever possible. The construction project will be <br />staged so that residents and emergency vehicles <br />will be able to drive on the streets at all times. If you <br />have special access needs, let us know. <br />Mail Delivery 8~ Garbage Pick up: The <br />construction work should not impact your mail <br />delivery or garbage pick up. Schedules and times <br />should remain unchanged. <br />Private Systems/ Gardens: Over the course of <br />this project the contractor will be digging in various <br />areas. If you have underground sprinklers, <br />electrical far yard lights, perennial gardens, or <br />invisible fences installed within 20 or 25 feet of the <br />edge of the street or in your yard, they need to <br />know where they are. Removal and reinstallation <br />of these items is the responsibility of the property <br />owner. Please mark with paint or flags the location <br />of underground wires or sprinklers immediately. If <br />these items are not marked, the contractor may <br />damage them when they start construction. The <br />City will not pay to repair or replace unmarked <br />systems. <br />Safety: Your assistance in maintaining a safe work <br />area is important. The size, weight, noise and dust <br />created by construction traffic make it difficult for <br />workers to watch onlookers. Heavy equipment <br />operators must concentrate on the job at hand and <br />may not notice children playing near or behind <br />equipment. <br />Please remind children to stay clear of the <br />construction area and equipment both during <br />working and non-working hours. <br />Residents should use caution at all times while <br />driving through the construction zone and be alert <br />for moving equipment, holes, trenches and other <br />hazards in the work zone. <br />P.E., Civil Engineer (651) 792-7048 <br />Project Coordinator (651) 792-7046 <br />Check for construction updates at: www.cityofroseville.com/projects. <br />