My WebLink
|
Help
|
About
|
Sign Out
Home
2009-10-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2009
>
2009-10-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:21:48 PM
Creation date
3/23/2010 2:45:06 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/27/2009
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Publie Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date; October 27, 2009 <br />Item No: G <br />Ltem Description: 2010 Public Works Workplan. <br />Background: Each year Public Works staff monitors and evaluates the condition of City <br />infrastructure for development of ongoing maintenance and replacement needs plans. We use <br />this information to develop capital improvement plans and in the development of the annual <br />budget request in these areas. We also work closely with Ramsey County and Mn/DOT on <br />improvements to City infrastructure as a part of their road improvement projects within <br />Roseville. 2010 proposed road construction is mainly mill and overlay of pavement due to <br />surface distress related to age of pavement since many streets were reconstructed in the 80's and <br />early 90's. The following are improvements that we are recommending for the 2010 <br />construction season on the city system. Ramsey County has not finalized their total work <br />program for 2010. <br />1. Pavement Management Pra~ram Projects: Each year the Public Works Department <br />evaluates infrastructure needs based on the City's Pavement Management Program and <br />assessment of utility infrastructure. Streets in marginal condition are recommended for <br />major maintenance by mill and overlay. Streets in poor condition are recommended for <br />reconstruction. We propose to include the following street segments in our 2010 <br />reconstruction contracts: <br />Mill and Overla <br />Brenner Ave (Cleveland Ave to Mount Ridge Rd) Highcrest Rd (W. Count Rd D to Brenner St} <br />Brenner Ave (Mount Ridge Rd to Evelyn St) Kent St (Iona Lane to Woodhill Dr) <br />Brenner Court (Old Hi hwa 8 to Cul-de-sac) Laurie Rd (Fernwood Ave to Lexington Ave) <br />Cleveland Service Dr N (Prior Ave to W. Perimeter Dr) Lincoln Dr (County Rd C2 to Lydia Ave} <br />Cleveland Service Dr N (W. County Rd l32 to Prior Ave) Lincoln Dr (Terrace Dr to Count Road C2) <br />County Road C2 (Cleveland Ave to Cul- de- sac} Mackubin St (Iona Ln to Woodhill Dr) <br />County Road C2 (Lincoln Ave to Snellin Ave) Mackubin St (Woodhill Dr to W. Count Road C) <br />Evel n St (W. County Rd D to Brenner Ave) Millwood St (Western Ave to Farrin ton Ave) <br />Farrington Ave (Owasso Blvd. to Stanbridge Cir) Mount Ridge Rd (W. County Rd D to Brenner Ave} <br />Farrington Ave (Stanbridge Cir to Millwood Ave) Sandhurst Dr (Fernwood Ave to Lexin ton Ave) <br />Farrington Cir (Transit Ave to Cul-de-sac) Sherren St (Fernwood Ave to Lexington Ave} <br />Highcrest Rd (Brenner St to Lydia Ave Virginia Cir (Transit Ave to Cul-de-sac) <br />Highcrest Rd (L dia Ave to Millwood Ave} Woodhill Dr (Kent St to Mackubin St) <br />Highcrest Rd (Maple Lane to W. County Road C2) Woodhill Dr (Mackubin St to Western Ave) <br />Highcrest Rd (Millwood Ave to Maple Lane} <br />
The URL can be used to link to this page
Your browser does not support the video tag.