The Mill and Overlay projects are proposed to be financed through our street infrastructure <br />funds and MSA funds. Our pavement condition and maintenance strategies result in a <br />recommended $750,000 annual program for our city streets, excluding the MSA system. <br />After receiving. bids for these projects, we will request that the City Council award the bid to <br />the- lowest responsible bidder. <br />2. Sanitary Sewer lining and replacement: The majority of the city's sanitary sewer mains <br />were constructed in the late 1950's and early 1960'x, utilizing clay file pipe. Over time the <br />joint materials have failed allowing root intrusion. The pipe is also susceptible to cracking <br />and construction damage. The 2010 Capital Improvement Plan includes funding for a <br />sanitary sewer main lining program to extend the life of our sanitary sewers by 50 years or <br />more. This technology essentially installs a new resin pipe inside the old clay file sewer <br />main without digging up city streets, which results in minimal disruption to residents during <br />construction. The liner pipe is inserted into the main through existing manholes and cured in <br />place with a heat process. Any given segment is usually completed in one working day. <br />Service line connections are reopened using a robotic cutter and remote cameras. During the <br />process, existing flows are bypassed using pumps. This technology has been proven over The <br />past 20 years, and costs have become competitive with open cut replacement. The City <br />started doing this type of renovation in 2006 and will have an annual project for the <br />foreseeable future- to replace our aging sewer infrastructure. This Technology also prevents <br />infiltration of groundwater into the system and can be credited. toward our inflow/ infiltration <br />surcharge. The location of this work varies and is spread throughout the City based on <br />system priority. <br />We are also evaluating needed sanitary and storm sewer replacement needs in our pavement <br />replacement areas as well as utility infrastructure needs in County and State project areas. <br />Those replacements are being identified as the project plans are being developed and will be <br />communicated to the Council at a later date. <br />3. Seal Coat; Pavement maintenance policies support an annual seal coat program of <br />approximately 15 miles of city streets each year. This consists of applying a film of <br />bituminous oil and covering it with fine aggregate. These treatments have proven to add. a <br />minimum of 10 years to the life of the pavement. With potential continued budgetary <br />constraints in 2010, we may need to reduce the size of the program depending on the bid <br />prices received in February 2010 for materials. Asphalt material prices are extremely volatile <br />and nearly doubled in price by mid-summer 200$. In 2009, they held at 200$ costs. it is <br />expected that these prices may continue to rise. Reducing the program will have a negative <br />impact on the life of the pavements as every $1 of deferred maintenance has a $5 future cost. <br />4. PathwaVS Work continues developing the- plans for the federally funded pathway along <br />1~airview Ave. from the Rosedale area to the St. Paul. campus of the University of Minnesota. <br />Initially construction was anticipated to begin in 2009 but due to workload in 2009 staff was <br />unable to develop final pans and specifications required for bidding. This project is <br />anticipated to be ready for bid in Spring 2010. The estimated cost for this project is <br />$1,OSO,OOD. <br />Financial Impacts <br />The Street Infrastructure Fund interest earnings support the local street Mill and Overlay <br />program. Due to current construction costs this level of program maybe in jeopardy for future <br />years due to lower interest earnings. MSA street overlays are proposed to be funded from the <br />