My WebLink
|
Help
|
About
|
Sign Out
Home
2010-02-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-02-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 4:06:14 PM
Creation date
3/23/2010 3:21:17 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/23/2010
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT Bridge Funds $ 5,000,000 <br />Mn/DOT Cooperative Agreement $ 590,000 <br />City of Roseville $ 465,000 <br />City of Little Canada $ 350,000 <br />City of Maplewood $ 120,000 <br />Roseville Community Requested Facility $ 325,000 <br />Surcharge (CRFS) <br />Little Canada Franchise Fee $ 350,000 <br />Other Funds $ 3,800,000 <br />Total $ 28,700,000 <br />The County is in the process of working with the Metropolitan Council to have the <br />current Surface Transportation Improvements Plan (STIP) amended to include the <br />project. The STIP must include the project in order for the Federal STP funds to be used. <br />The County is also working to secure additional DEED money for the project. <br />The total proposed city of Roseville funding allocated to the project is as follows: <br />Financing Source Estimated Amount <br />Municipal State Aid (MSA) $ 201,380 <br />Special Assessments $ 69,820 <br />Water Utility Fund $ 193.800 <br />Total <br />$ 465,000 <br />Roseville's share of the overall project cost is, therefore, approximately 2 percent. <br />6. ESTIMATED ASSESSMENTS <br />A portion of the City of Roseville's cost participation for this project is proposed to be <br />provided by special assessments to the benefiting property owners. State Statute 429 has <br />two major points to consider when justifying assessments. First, the assessment has to <br />treat similar properties equally. Secondly, the amount of the assessment has to be equal to <br />or less than the resulting increase in property value. <br />If construction of the proposed improvements is completed by fa112011, consistent with <br />the current schedule, the final assessment amount would be determined following an <br />assessment hearing in the fall of 2012 and a thorough review of the proposed assessments <br />by the Council. To develop the preliminary assessment roll the following items were <br />assumed: <br />All properties that have frontage on Rice Street are proposed to be assessed. <br />Each lot has a long side and a short side. If the property has a short side on <br />Rice Street, 100% of the frontage is assessable. To establish assessable <br />frontages for non-residential corner lots where the long side is on Rice Street, <br />the frontage is calculated as follows: assess 10% of the long-side frontage for <br />the first 150 feet; any additional assessable footage will be calculated 100%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.