My WebLink
|
Help
|
About
|
Sign Out
Home
2010-02-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-02-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 4:06:14 PM
Creation date
3/23/2010 3:21:17 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/23/2010
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No more than 25% of the city of Roseville's share of the street reconstruction <br />project costs shall be assessed. City of Roseville costs are detailed in the city <br />cost participation summary table included in Appendix B. The city cost <br />participation for the project was determined in accordance with the current <br />Ramsey County cost participation policy for projects receiving federal funds. <br />Any utility replacement/repair to be funded by the appropriate utility fund and <br />not become part of the assessable portion of the project. <br />MSA funds shall pay for all remaining street reconstruction project costs. <br />Street Assessment Summary <br />City of Roseville share of cost for Street Reconstruction <br />Ramsey County Inspection (12%) <br />Roseville Engineering Cost (5%) <br />Right-of--Way Acquisition <br />Total Assessable Project Cost <br />Total Frontage (feet) <br />Recommended Street Assessment: <br />100% of project cost/foot <br />25% of project cost/foot <br />Total Assessments <br />$ 199,600.00 <br />$ 44,700.00 <br />$ 9,980.00 <br />$ 25,000.00 <br />$ 279,280.00 <br />1,791.06 <br />$ 155.93 <br />$ 38.98 <br />$ 69,820.00 <br />There are a total of 10 properties to be assessed for the street reconstruction. The total <br />amount to be funded through assessments is $69,820.00. <br />A preliminary assessment roll is included in Appendix C. The preliminary assessment <br />roll details the proposed assessments by individual property. <br />7. PROJECT SCHEDULE <br />The following is the proposed schedule for the project. <br />City Council Receives Feasibility Report February 8, 2010 <br />Public Hearing/City Council Authorize Plans & Specs, March 8, 2010 <br />Approve Plans & Specs & Municipal Consent <br />Bid Opening May 2010 <br />Start Construction June 2010 <br />Construction Complete Fa112011 <br />8. SUMMARY AND RECOMMENDATIONS <br />Based upon the analysis completed as a part of this report, the proposed Ramsey County <br />TH 36/Rice Street Interchange improvements, Roseville City Project 09-11, are feasible, <br />necessary, and cost effective. We recommend the following: <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.