My WebLink
|
Help
|
About
|
Sign Out
Home
2010-01-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-01-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2010 3:58:33 PM
Creation date
3/23/2010 3:38:07 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/26/2010
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RICE STREET/HIGH~~'r~Y 36 INTERCHANGE ItiIPRO~'E~lIE?~~CS <br />Cor~~trat~~iE i~~ Ji`~g~rz~ r~~i~ ~~~1:~~~sit2~~ <br />Construction of improvements on Rice Street will generally occur in three <br />phases, with construction of the east half of the new Rice Street bridge and <br />northbound lanes occurring in the first phase. During this phase, one lane of <br />traffic in each direction will be maintained on the west half of the existing <br />roadway. Phase two will begin with removal of the existing bridge and <br />includes construction of the southbound lanes and west half of the Rice Street <br />bridge. During the second phase, one Pane of traffic in each direction will be <br />maintained on the newly constructed east half of Rice Street. <br />The third phase will consist of construction of the new raised median with <br />traffic being maintained on the outside lanes of the new roadway. Highway <br />36 will continue to carry two lanes of traffic in each direction with only <br />periodic short term (non rush hour) or overnight lane closures. Access to and <br />from Highway 36 will be maintained on either existing or temporary ramp <br />alignments until the new ramps are ready for use, with limited disruption to <br />service. <br />~~ <br />~~,~ti> ds ~~~ ~ro~~~:~ ~ei~a~ ~-~I~d,~.~~.~ <br />The county is in the process of finalizing funding sources for the project, <br />which include grants from Federal Surface Transportation (STP) funds and <br />the Department of Employment and Economic Development (DEED); <br />Mn~DOT Local Interchange, Trunk Highway Turnback, Bridge, and <br />Cooperative Agreement funds; city funds; and property owner assessments. <br />Additional funding information will be available at the January 20th open <br />house. <br />\NNESp J <br />1 <br />~. ~ ~ ~ ~ ' t ~._-- ~ ~ ~ ~ll~ ~ ~ _ _ i,'`,~ KimleyHom <br />l ~ o~Efl ~ ni'inf i ~ ~ ~ ",,, .,i l `' `. ~ ~ ~ ~ `~ ~°-~ t ~ ~~ =and Associates, lnc ~ -- <br />° ~ ~~i6 <br />~~'or rfl^~~~~ ____, <br />
The URL can be used to link to this page
Your browser does not support the video tag.