My WebLink
|
Help
|
About
|
Sign Out
Home
2006-06-20_Agenda
Roseville
>
Commissions, Watershed District and HRA
>
Housing Redevelopment Authority
>
Agendas and Packets
>
2006
>
2006-06-20_Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 8:05:06 AM
Creation date
3/24/2010 1:41:15 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Housing Redevelopment Authority
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/20/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHRP <br />GREATER METROPOLITAN HOUSING CORPORATION - TWIN CITIES <br />Project Address 1000 Woodhill Drive, Roseville MN <br />Building Type Single Family 3 brs, 1 bath, 1 car attached garage (1-1/2 Story, Cape Cod) <br />Sellers Names Mildred Roesch H# (651) 281-9895 M# (605) 261-6547 <br />Cons MGR Curt Bennett <br />Inspection Date May 15, 200 6 <br />Revised Estimate June 5, 2006 <br />Well Sealed Square footage 1123.00 <br />Lot size .37 Acres <br />Year Built 1951 <br />SCOPE OF WORK-CONSTRUCTION REHAB ESTIMATE (ICWC) <br />S ect i on D escr i pt i on o f construct i on re h a b E st i mate d Mild re d V a l ue o f Number Work To Do Alternate <br />Reg Items Add Items Add Items <br />DIVISION 2 SITE WORK Selective Demolition 02070 Remove the wallpaper in the kitchen, baths & al l <br /> other areas$100.00 <br />Remove and dispose of the carpet on the 2nd floor and the stair s $100.00 <br />Remove drapes & fill holes $50.00 <br />Remove and dispose of the rear wooden dec k $250.00 <br />Remove and dispose of the misc. debris in the house and garag e $250.00 <br />Perform a final clean of the entire home upon completion.$150.00 <br />Clean, repair and refinish the composite tile on the 2nd floor after <br /> the carpet has been removed.$150.00 <br />Remove and dispose of the old fiberglass insulation in the garag e $10.00 <br />Landscaping 02900 Clean and update the existing landscapin g $350.00 Alternate : Regrade and install landscaping (sod, rock?) at the rear of <br /> the home and garage after the rear deck is remove d $650.00 <br />Alternate: Supply and install new shrubs at the front of the home $250.00 <br />Weed and mow the rear yard and garden $150.00 Alternate : Remove & replace the existing window well s $150.00 <br />Trim and balance the trees and bushes around the house and <br /> garage $150.00 <br />Remove/trim the large evergreens at the front of the home $250.00 <br />DIVISION 3 CONCRETE <br />DIVISION 4 MASONRY Masonry Restoration 04525 Remove and replace the existing masonry chimney cap $250.00 <br />DIVISION 5 METALS <br />Metal Railings <br />Page 1 Original%20Scope%20of%20Work%20Rehab%20Estimate%20ICWC,%206-5-06%201000%20Woodhill,%20Roseville%20[1]
The URL can be used to link to this page
Your browser does not support the video tag.