My WebLink
|
Help
|
About
|
Sign Out
Home
2006-06-20_Agenda
Roseville
>
Commissions, Watershed District and HRA
>
Housing Redevelopment Authority
>
Agendas and Packets
>
2006
>
2006-06-20_Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 8:05:06 AM
Creation date
3/24/2010 1:41:15 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Housing Redevelopment Authority
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/20/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 6 WOOD <br />Finish Carpentry <br />06200 Supply and install a wooded balustrade at the basement stairs$250.00 <br />Re-install the basement handrail$50.00 <br />Alternate: Remove & replace the cabinet hardware in the kitchen & bath $200.00 <br />Supply and install a 10' x 10' wooden deck in the rear yard$3,000.00 <br />Adjust the door closer on the front storm door$5.00 <br />DIVISION 7 THERMAL AND MOISTURE PROTECTION <br />Asphalt Roofing Alternate: Insulate the 2nd floor knee walls, ceiling and access panels $1,200.00 <br />07310 <br />DIVISION 8 DOORS AND WINDOWS Entry Doors and Frames 08110 Remove and replace the rear garage service doo r $350.00 <br />DIVISION 9 FINISHES <br />Painting <br />09900 Alternate: Fill cracks & repair holes in walls and ceilings in upper <br /> & main level and paint upper levels (includes stair wells)$1,500.00 <br />Touch up walls and ceilings (Owner to do)$0.00 <br />Misc painting walls & ceilings $350.00 <br />Clean and reseal the 2nd floor stairs$250.00 <br />Remove and replace the damaged wooden shakes on the exterior of the <br /> home and prime and re-coat $550.00 <br />Prep and re-seal the new garage service door $50.00 <br />Screen and re-seal the existing wood floors in the hall and brs$250.00 <br />Fill the holes and finish the walls to match where the bath light fixtures <br /> were removed$100.00 <br />Sand and touchup the finish on existing bath tub$100.00 <br />DIVISION 10 SPECIALTIES <br />DIVISION 11 RESIDENTIAL APPLIANCES <br />DIVISION 12 FURNISHINGS <br />P lastic Laminate & Cultured <br /> Marble <br />12380 Remove & replace the kitchen countertops $850.00 <br />DIVISION 15 MECHANICAL <br />Plumbing <br />15400 Secure the existing gas line for the dryer to the wall and install <br />Page 2 Original%20Scope%20of%20Work%20Rehab%20Estimate%20ICWC,%206-5-06%201000%20Woodhill,%20Roseville%20[1]
The URL can be used to link to this page
Your browser does not support the video tag.