My WebLink
|
Help
|
About
|
Sign Out
Home
2004-03-16_Agenda
Roseville
>
Commissions, Watershed District and HRA
>
Housing Redevelopment Authority
>
Agendas and Packets
>
2004
>
2004-03-16_Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2015 10:44:43 AM
Creation date
3/25/2010 1:04:52 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Housing Redevelopment Authority
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/16/2004
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2The Master Plan projects new housing units to be developed and/or renovated in a number of <br />phases. In addition, the Plan includes the opportunity to provide new and or renovated <br />neighborhood retail, new housing and/or office space in the areas along Rice Street. This Plan <br />identifies development areas in phases based upon anticipated short and long range <br />development timeframes and through a market based approach to redevelopment. Currently <br />there are 101 apartment units, 38,545 sq.ft. of retail space and 44,676 sq.ft. office space in the <br />study area. This plan could add 30 to 50 housing units in the first phase. <br />2.3The use of the site at 185 North McCarrons Blvd (Guptil property) for multi-family housing <br />along with more efficient and effective use of the Armory and Church sites through increased <br />partnerships are considered to be the highest priority to be implemented in the next 2-5 years as <br />Phase I. <br /> As an alternative to medium to high density housing, it is possible that the Armory <br />and/or the Church could propose a use on the Guptil site that would include related church, <br />church housing, a specialized school, or other service needs. Staff has prepared several options <br />for site development as part of Phase I. <br />South side of site: <br /> 36 -45 units of senior apartments, cooperatives or condo or 12 three <br />story townhomes. Staff is not recommending that the Guptil property be sold for the <br />development of a few large single family units. This would not be the most effective use <br />of the site. The higher dense option provides more return for the property owner and <br />could serve to provide an alternate housing option for seniors currently living in single <br />family homes that could become available for new families. <br />North side of site: <br /> A maximum of 6 two level for sale townhomes or 4 small lot single <br />family homes. Each option provides new ownership opportunities for empty nesters, <br />young professional and young families. <br />Phase II <br />2.4The proposal, peripheral to the Guptil site, is a 2-10 year plan and includes the <br />improvement of the area multi family complexes, ongoing single family residential <br />improvements and the more complete redevelopment of the Armory site. This WILL require a <br />concerted effort and investment by the HRA. <br />Phase III proposal <br />2.5The, the Rice Street commercial areas are a 10 to 20 year plan. Because <br />the project is market based with development by the private sector, the phases need scheduling <br />flexibility within those specified time frames. The Plan may be modified to be more <br />marketable and financially feasible while taking into consideration the planning principles and <br />goals of the Plan, the surrounding neighborhood needs, the environment and the community as <br />a whole. This WILL require both city and HRA effort and investment. <br />2.6Each Phase is explained in more detail in the master plan document. In addition, background <br />information, summary of meetings and suggested land use issues are also summarized. <br />McCarrons Draft Master Plan 03.16.04 Page 2 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.