My WebLink
|
Help
|
About
|
Sign Out
Home
2001-02-08_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Minutes
>
200x
>
2001
>
2001-02-08_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2010 1:39:56 PM
Creation date
3/30/2010 1:39:50 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
2/8/2001
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />C. REPORTS <br />G1 Review of proposed West Owasso Boulevard reconstruction project <br />The Cities of Shoreview and Roseville are proposing to reconstruct West <br />Owasso Boulevard from Victoria Street to North Owasso Boulevard in <br />2001. Generally, West Owasso Boulevard is a former County Road that <br />has been turned back to Shoreview and Roseville. The project includes <br />resurfacing, curb and gutter, an off-road pathway and new storm sewer. <br />This project will remove all the direct discharges to Lake Owasso from <br />West Owasso Boulevard that exist today. In addition, new pond and <br />infiltration facilities will be installed to improve water quality. More <br />specifically, the project includes: <br />In Shoreview: <br />• 32' wide roadway with parking allowed on one side <br />• 8' bituminous separated pathway west of road <br />• Stormwater from south end of project to be directed to new <br />joint Roseville/Shoreview ponds north of Charlie Pond <br />• Stormwater from north end of project to be either discharged <br />north of North Owasso Boulevard or to Lake Emily with grit <br />removal <br />In Roseville: <br />• 26' wide roadway with parking bays <br />• 8' bituminous separated pathway west of road <br />• Stormwater from north end of project to be directed to new <br />joint Roseville/Shoreview ponds north of Charlie Pond <br />• New pond to be constructed at south end of project <br />• Rainwater gardens to be constructed at west end of project <br />D. BILLS <br />D-1 Bills to be considered for payment <br />Roessler moved approval of payment of the following bills: <br />1. Barr Engineering Company Invoice # 2362645-17 $1,252.96 <br />2. Barr Engineering Company Invoice # 2362645-18 $1,029.81 <br />TOTAL: $2,282.77 <br />Soderbeck seconded. Ayes: 4 Nays: 0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.