Laserfiche WebLink
Page 2 <br />C. REPORTS <br />G1 Review of proposed West Owasso Boulevard reconstruction project <br />The Cities of Shoreview and Roseville are proposing to reconstruct West <br />Owasso Boulevard from Victoria Street to North Owasso Boulevard in <br />2001. Generally, West Owasso Boulevard is a former County Road that <br />has been turned back to Shoreview and Roseville. The project includes <br />resurfacing, curb and gutter, an off-road pathway and new storm sewer. <br />This project will remove all the direct discharges to Lake Owasso from <br />West Owasso Boulevard that exist today. In addition, new pond and <br />infiltration facilities will be installed to improve water quality. More <br />specifically, the project includes: <br />In Shoreview: <br />• 32' wide roadway with parking allowed on one side <br />• 8' bituminous separated pathway west of road <br />• Stormwater from south end of project to be directed to new <br />joint Roseville/Shoreview ponds north of Charlie Pond <br />• Stormwater from north end of project to be either discharged <br />north of North Owasso Boulevard or to Lake Emily with grit <br />removal <br />In Roseville: <br />• 26' wide roadway with parking bays <br />• 8' bituminous separated pathway west of road <br />• Stormwater from north end of project to be directed to new <br />joint Roseville/Shoreview ponds north of Charlie Pond <br />• New pond to be constructed at south end of project <br />• Rainwater gardens to be constructed at west end of project <br />D. BILLS <br />D-1 Bills to be considered for payment <br />Roessler moved approval of payment of the following bills: <br />1. Barr Engineering Company Invoice # 2362645-17 $1,252.96 <br />2. Barr Engineering Company Invoice # 2362645-18 $1,029.81 <br />TOTAL: $2,282.77 <br />Soderbeck seconded. Ayes: 4 Nays: 0. <br />