My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes_102794
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Minutes
>
199x
>
1994
>
Minutes_102794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2010 2:55:27 PM
Creation date
4/12/2010 2:55:14 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
10/27/1994
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The removal efficiency of ponds and. wetlands is greater than originally , <br />estimated. <br />Surface loading to lakes are higher than previously estimated, <br />The effects of these findings is that the best management practices (BMP's) <br />.identified in the original diagnostic feasibility study are still valuable. The <br />BMP's still need to be evaluated to determine cost effectiveness. <br />The final report will be completed in upcoming weeks and will be mailed to the <br />.Board prior to the next regularly scheduled meeting. <br />2. American Legion Pond Project <br />Lobermeier summarized the pre-permit investigation recently completed. The <br />Board discussed the merits of the American Legion Pond project and how it fit <br />into the recent findings ofthe SWMM Model update. Staff indicated that, of the <br />proposed BMP's, the American Legion Pond project provided the most removal <br />of phosphorous currently entering Lake Owasso. Staff indicated that while a <br />detailed cost benefit analysis is dfficultto construct, the American Legion Pond <br />..project will, in the long run, provide benefit to Lake Owasso. It was noted that it <br />..maybe difficult to see a difference in actual in-lake water quality in the <br />immediate future. <br />"Keel stated that. if this project were to proceed this winter, it would be best to <br />construct. the project during the months of January and February. Therefore, it is <br />necessary to get approval from the Board to proceed at this time. <br />Martin moved that the board approve the construction ofthe American Legion <br />Park pond project at an estimated cost of $78,600. Olson seconded. Ayes: <br />Martin, Roberts, Meyer, Olson, and Smith. Nays:. None. <br />3. Lake Water Quality Planning <br />Lobermeier summarized the schedule of the Lake Water Quality Planning Project <br />noting that phase one was nearing completion. Keel summarized the kick-off <br />meeting with the technical advisory group. This meeting•was held on October 27, <br />1994. The following people attended: <br />Terry Noonan -Ramsey County <br />Randall Anhorn -Metropolitan Council <br />Molly. Shodeen - DNR <br />Wayne Jacobson -SEH <br />Mark Lobermeier -SEH <br />Karl Keel -City of Roseville <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.