My WebLink
|
Help
|
About
|
Sign Out
Home
1995-04-27_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1995
>
1995-04-27_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2010 3:56:26 PM
Creation date
4/12/2010 3:08:05 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/27/1995
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- The Lake Wabasso loading from Lake Owasso is over predicted in the original <br />and current models. <br />- The total loading to American Legion Pazk Pond and Lake Owasso is much <br />lower in the current model due to higher removal efficiency estimates in <br />Bennett Lake and reduced tributary area loading. <br />- Monitoring data for the lakes from MPCA's STOREY reference (1971-1993) <br />shows a higher current phosphorous level than was assumed in the original <br />lake response data. <br />Major recon-,mendations: <br />The GLWMO should proceed with the three BMPs for Owasso, Wabasso, <br />and Snail Lakes as recommended by BARR (1991). <br />- The Boazd should. lower its expectations for significant lake response to <br />BMPs as presented in the BARB Study (1991). <br />2. Lake Water Quality Planning <br />Joel Schilling, Senior Scientist-Limnologist reviewed the findings on Lake Owasso <br />and what recommended management measures should be considered. <br />3. American Legion Pond Project <br />Lobermeier summarized the project status. Plans and specifications are complete. <br />Bid opening is scheduled for February 9, 1995. Award of bid is scheduled for <br />February 13; 1995. Weather could be a deterrent. <br />Board directed staffto have informational signs installed during construction <br />informing the public of the improvement and that it is being constructed to <br />improve lake quality of Lake Owasso by GLWMO. <br />E. Bills <br />E-1 Meyer moved that the Board approve the following invoices to be paid by the <br />GLWMO: <br />SEH Miscellaneous water resources services $990.47 <br />Services for the period ending April 23, 1994 <br />(not processed at July 28, 1994, meeting) <br />SEH Miscellaneous water resources services $663.63 <br />Services for the period ending October 31, 1994 <br />1, <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.