Laserfiche WebLink
CO'C1N'1"Y 1E~OAD 96 <br />Tt-a Draft Design Concept Report has bec+n completed and is available for public eeview. This Concept <br />Report is no# detailed enough to include storm drainage design or specific water quality pond locations, <br />however,. it is Ramsey County's understanding that all GLWMO requirements will apply to the final design <br />of the project. A detailed design is SChoduled to begin this spring and construction of the portion of County <br />Road 96 within GLWM~ is slated for the summer of i 997. <br />WASTE OTL FACILITY PR®JEG'T <br />T'be City has upgraded its waste oii facility to promote eesponsible disposal of waste oil in an effort to <br />reduce the amount of contamination to wetlands and receiving waters. The improvement consisted. of <br />replacing the 450 gaion underground storage tank with a 4,000 gallon capac[ty tank. The Sberglass coated <br />steel tank is equipped with an electronic monitoring device and a structure was constructed over the fill <br />pipe.. A small amount of contaminated soil associated with removal of the old. #ank is being stored on-site <br />pending MFCA permission for disposal. <br />TOTRL P.03 <br />