My WebLink
|
Help
|
About
|
Sign Out
Home
1998-10-22_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1998
>
1998-10-22_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2010 3:51:07 PM
Creation date
4/13/2010 2:00:24 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/22/1998
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. WASHINGTON COUNTY GREENWAYS CORRIDOR PROJECT <br />Cordelia Pierson was present to discuss The Green Corridor Project, atwo-year LCMR-funded <br />project in Washington and Chisago Counties to help communities accommodate growth while <br />preserving the landscape of the area. Incentives and tools are being made available to landowners <br />to encourage land conservation. These voluntary tools will be the primary mechanisms to create <br />the Green Corridor: <br />• Donated Conservation Easements <br />• Purchased Development Rights (PDR) (a public purchase of the conservation easement) <br />• Transferred Development Rights (TDR) <br />• Land Acquisition <br />Existing protected lands will be linked with other important open spaces, including high quality <br />farmland, stream corridors, wetlands, wildlife and recreational corridors, environmentally sensitive <br />areas, cultural lands, natural resources, and scenic areas. Information will be collected from <br />meetings with local governments and from upcoming town hall forums, then inventoried and <br />mapped by their technical advisory committee. They plan to have alternative corridors identified by <br />the end of the year. <br />A public opinion survey they conducted found that 85% of Washington County residents support <br />the protection of more open space. They have created various educational materials, including a <br />landowner options handbook. She also presented to the District a copy of their video and another <br />handbook entitled "A Land Protection Toolbox for Local Government." She received suggestions <br />from the Board on other community groups who would be interested in this presentation. <br />Louise Watson mentioned that the Carver Lake watershed management plan (including La Lake) <br />will be developed next year, which is probably the last area within our watershed district that has <br />potential for open space. She is interested to see what opportunities arise between now and the <br />next construction season where open space could be designated in this area. Cliff Aichinger stated <br />that corridor protection elements are also being incorporated into the District-wide vegetative <br />inventory. <br />6. PROJECT STAT~IS REPORTS <br />1999 Capital Improvement Projects -continued discussion <br />Roger Lake requested that all references contained. in the CIP report to wetland detention for new <br />developments be consistent with the approach as defined in the Watershed Management Plan. <br />Relative to last month's Board action to authorize the start of the Tamarack Swamp plant inventory, <br />Tom MacDonald reported that the accompanying aerial photo work was finished as of Friday, and <br />the subcontractor will begin work on the plant inventory next week. The consultant's findings on <br />the wetland fill impacts will be presented at the October Board. meeting. <br />Discussion was held on the revised approach taken this year towards CIP planning by preparing <br />feasibility studies prior to levying project money. Brad Lindaman explained that the costs <br />projected in the report assume that the District is paying the full cost. However, as each project is <br />implemented, city engineers will become involved and responsibilities will be clarified. The cities <br />may choose to do some of the work with their own staff which will reduce the District costs. <br />Cliff reported on yesterday's meeting with MnDOT project engineers to discuss the possibility of <br />state funding for the proposed ponds along I-94. They will require Board approval of a banking <br />agreement before further activity can proceed. He also learned that over the next five to ten years, <br />MnDOT is proposing various lane realignments and ponds on the stretch of combined I-35E /I-694 <br />in Little Canada which may affect the Owasso Basin project. <br />Discussions were completed by the Board, resulting in no substantial changes to the 1999 CIB <br />Recommendations report. The projects will be considered at the Public Hearing on September 2, <br />1998. <br />Page 3 August S, 1998 RWMWD Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.