Laserfiche WebLink
Item Description: Staff reports on pending matters <br />Page 2 <br />b. Highway 49/Chippewa School Access <br />The design features include reconstruction of Highway 49 from Tanglewood Drive to Birch Lane <br />South to a width that would allow striping as a 3-lane-wide shouldered facility initially. A <br />reconfiguration as a 5-lane (no shoulders) facility would be adopted at some point in the future <br />when traffic volumes warrant the additional capacity. Because of timing issues associated with <br />other major roadway improvements in the area, the County is tentatively planning for some form <br />of improvement along Highway 49 in 2001 or 2002. <br />c. Highway 96 -Segment 3 Lexington to Mackubin <br />The project is near completion and effectively shut down for the winter. Median trees will be <br />planted in the spring. Staff continues to work with Ramsey County officials to address minor <br />cleanup and restoration work. <br />d. Brigadoon Neighborhood Street Renewal <br />An Open House meeting is scheduled for January 21. Staff continues to work on the Feasibility <br />Report and hopes to present the report to the City Council on February 1. This report will analyze <br />the potential water quality improvements for the project area. <br />