Laserfiche WebLink
Section 3 <br />Strategies for Physical Conditions Affecting Surface Water Drainage <br />C4) Move structures within the floodplain out of it instead of install flood <br /> control structures. <br /> Implementation Team: Residents, cites, VBWD, DNR. <br />Specific Strategy: A) Develop and implement a Land Protection Plan <br />B) Develop or revise current stormwater management plans <br />C) Develop a flood protection plan. <br />D) Develop an erosion control plan. <br />E) Develop a buffer plan. <br />F) Ensure septic systems are up to code. <br />G) Foster the use of "green" lawn care products and techniques, proper <br /> disposal of chemicals, proper use of herbicides and pesticides, and <br /> locations of pastures. <br />Actions and D1) Use Natural Resources Inventory data to identify sediment delivery <br />Implementation areas and sediment treatment areas. <br />Team(s): Implementation Team: Washington SWCD,VBWD, DNR, BWSR, <br />Science Museum, University of MN, cities, counties. <br />D2) Determine criteria for prioritization of needed projects, develop a <br />prioritized list of potential stabilization projects. <br />Implementation Team: Washington SWCD, Advisory Committee, <br />VBWD, DNR, BWSR, Science Museum, University of MN, cities, <br />counties. <br />D3) Approve criteria and list. <br />Implementation Team: Advisory Committee <br />D4) Identify the most appropriate stabilization alternative for each <br />project. <br />Implementation Team: VBWD, Washington SWCD, cities, counties <br />D5) Fund and implement stabilization projects. <br />Implementation Team: VBWD, Washington SWCD, cities, county, <br />landowners, BWSR, DNR. <br />D6) Continue to enforce steep slime ordinances, modify them if needed. <br />Implementation Team: Cities. <br />D7) Follow Best Management Practices on all construction sites. <br />Implementation Team: Developers. <br />D8) Host an educational seminar for developers on the importance of <br />erosion control <br />3-10 <br />