My WebLink
|
Help
|
About
|
Sign Out
Home
2000-01-06_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
200x
>
2000
>
2000-01-06_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2010 9:14:50 AM
Creation date
4/14/2010 9:09:39 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/6/2000
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />Strategies for Physical Conditions Affecting Surface Water Drainage <br />C4) Move structures within the floodplain out of it instead of install flood <br /> control structures. <br /> Implementation Team: Residents, cites, VBWD, DNR. <br />Specific Strategy: A) Develop and implement a Land Protection Plan <br />B) Develop or revise current stormwater management plans <br />C) Develop a flood protection plan. <br />D) Develop an erosion control plan. <br />E) Develop a buffer plan. <br />F) Ensure septic systems are up to code. <br />G) Foster the use of "green" lawn care products and techniques, proper <br /> disposal of chemicals, proper use of herbicides and pesticides, and <br /> locations of pastures. <br />Actions and D1) Use Natural Resources Inventory data to identify sediment delivery <br />Implementation areas and sediment treatment areas. <br />Team(s): Implementation Team: Washington SWCD,VBWD, DNR, BWSR, <br />Science Museum, University of MN, cities, counties. <br />D2) Determine criteria for prioritization of needed projects, develop a <br />prioritized list of potential stabilization projects. <br />Implementation Team: Washington SWCD, Advisory Committee, <br />VBWD, DNR, BWSR, Science Museum, University of MN, cities, <br />counties. <br />D3) Approve criteria and list. <br />Implementation Team: Advisory Committee <br />D4) Identify the most appropriate stabilization alternative for each <br />project. <br />Implementation Team: VBWD, Washington SWCD, cities, counties <br />D5) Fund and implement stabilization projects. <br />Implementation Team: VBWD, Washington SWCD, cities, county, <br />landowners, BWSR, DNR. <br />D6) Continue to enforce steep slime ordinances, modify them if needed. <br />Implementation Team: Cities. <br />D7) Follow Best Management Practices on all construction sites. <br />Implementation Team: Developers. <br />D8) Host an educational seminar for developers on the importance of <br />erosion control <br />3-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.