My WebLink
|
Help
|
About
|
Sign Out
Home
2000-01-06_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
200x
>
2000
>
2000-01-06_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2010 9:14:50 AM
Creation date
4/14/2010 9:09:39 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/6/2000
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />Strategies jor Physical Conditions Affecting Surface Water Drainage <br />stormwater. Subactions include Actions 1, 2, 3 of Watershed <br />Processes. <br />Implementation Team: VBWD, Cities, Counties, MAWD. <br />B5) Voluntarily install infiltration facilities in developed areas. (Replace <br />curb and gutters with swales and ditches, if applicable.) <br />Implementation Team: Cities, developers, landowners. <br />B6) Give assistance and incentives to individuals and developers to <br />install and maintain infiltration facilities. <br />Implementation Team: Cities, VBWD, Washington SWCD, BWSR, <br />MPCA, DNR, Advisory Committee, MAWD. <br />B7) Seek funds for infiltration implementation restoration projects. <br />Implementation Team: Washington SWCD, VBWD, DNR, BWSR, <br />cities. <br />BS) Set up a stormwater utility to cover costs related to maintenance of <br />infiltration and other stormwater related facilities. <br />Implementation Team: VBWD or cities <br />B9) Prepare a map of ephemeral and drainage systems and educate the <br />public about watershed processes and the concept of drainage. <br />Implementation Team: Advisory Committee, Washington SWCD, <br />DNR, BWSR, University of MN. <br />Specific Strategy: A) <br />B) <br />4C) <br />D) <br />E) <br />F) <br />G) <br />Develop and implement a Land Protection Plan <br />Develop or revise current stormwater management plans <br />Develop a flood protection plan. <br />Develop an erosion control plan. <br />Develop a buffer plan. <br />Ensure septic systems are up to code. (Y action) <br />Foster the use of "green" lawn care products and techniques, proper <br />disposal of chemicals, proper use of herbicides and pesticides, and <br />locations of pastures. (5 actions) <br />--factions and C1) Establish a flood_level of the entire creek. __ _ <br />Implementation Implementation Team: VBWD <br />Team(s): <br />C2) - Continue to prohibit new development in floodplains. <br />Implementation Team: VBWD <br />C3) Continue to enforce floodplain ordinances. Modify them if needed. <br />Implementation Team: Cities <br />3-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.