Laserfiche WebLink
B-2 The Board reviewed the following correspondence sent by the GLWMO since the <br />October 28, 1999 meeting: <br />No correspondence was sent since the October 28, 1999 meeting. <br />C. REPORTS <br />C-1 Water Management Planning -Barr Engineering Progress Report <br />Karen Chandler reviewed a proposed workplan with. the following meeting dates: <br />• January 6, 2000 <br />• January 20, 2000 <br />• February 3, 2000 <br />• February 17, 2000 <br />• March 16, 2000 <br />• May 18, 2000 <br />• May 25, 2000 or June 1, 2000 <br />• June 22, 2000 or June 29, 2000 <br />• August 24, 2000 <br />• September 7, 2000 <br />• November 9, 2000 <br />• November 22, 2000 <br />• January 11, 2001 <br />• February 1, 2001 <br />Soderbeck moved. the elimination of the previously adopted meeting schedule (October <br />28, 1999) and adoption of the new schedule proposed by Barr Engineering. All meetings <br />are to be held at 5:00 p.m. at the Roseville City Hall. <br />Stark seconded. Ayes: 4 Nays: 0 <br />D. ADJOURNMENT <br />Soderbeck moved the meeting be adjourned at 7:00 p.m., Roessler seconded. <br />Ayes: 4 Nays: 0 <br />